OPERATING MANUAL PAT-806 version 1.08
20
4.1 Preliminary test
Connect the mains plug of the tested device into the test
socket of the meter.
Press the button of initial measurement
.
After that meter is prepared for measure-
ment.
Press
START
.
Read the result.
Symbols
and
are blinking.