MECHANICAL INSTALLATION
HIGH TANK MODELS:
1) Put the pulper/extractor into position as shown on the Installation Drawings.
2) Place the Anti-Vibration Pads under each leg of the Pulper and Hydra-Extractor
®
.
3) TRAY FEED UNITS ONLY - Install the tray to the Pulper (if it was not already installed at the
factory) using the provided gasket material and hardware.
4)
TROUGH FEED UNITS ONLY - Install the provided trough gasket between the Pulpers
inlet and the trough outlet and secure with the provided hardware.
UDT MODELS:
1) Cut a hole in the top of the table as shown in the Installation Drawing using the following
diameter: SPC-75S Pulper - 22" Diameter hole
2) Center the provided UDT Cone beneath the opening and weld it into place as shown.
Please follow print detail for welding instructions.
3) Put the Pulper into position.
4) Place the anti-vibration pads under each leg of the Pulper and Hydra-
Extractor
®
.
5) Install the UDT gasket onto the Pulper tank and around the outside of the adapter cone.
*see image on next page
6)
Adjust the Pulper and Hydra-Extractor
®
legs so that the rubber UDT gasket provides a
water tight seal with 2” clearance between Pulper and table.
7)
Install the provided trough gasket between the Pulpers inlet and the trough outlet and
secure with the provided hardware.
Summary of Contents for SPC-75S
Page 12: ...Installation ...
Page 16: ...MOUNTING DETAIL OF TROUGH ...
Page 21: ...FOR REFERENCE ONLY ...
Page 22: ...Start Up ...
Page 26: ...Operation ...
Page 32: ...CLEANING YOUR SYSTEM ...
Page 38: ...MAINTENANCE ...
Page 49: ...TROUBLESHOOTING ...
Page 56: ...REPLACEMENT PARTS EXPLODED VIEWS ...
Page 57: ......
Page 60: ......
Page 62: ......