99
p) The upper tab r previously mentioned must pass between the finish front and the
structure of the machine as shown in Figure 66. In the case of Alpes K300 Tab is not
visible.
a) b)
Figure 66 - Attach the tabs to the side frames
q) After attaching the sides, tighten these to the equipment frame. In the case of the
Alpes K400 using two screws A (DIN 912 M5x12) and two nuts B (DIN 6923 M5), in the
prepared holes see Figure 67-a and b.
a) b)
Figure 67 A and B - Fixing of the structural sides
14º (Alpes K400)
14º (Alpes K400)
14º (Alpes K400)
14º (Alpes K400)
Summary of Contents for K100
Page 149: ...144 ...
Page 150: ...145 ...
Page 151: ...146 ...
Page 165: ...160 26 Flow chart 26 1 Flow chart K100 K200 K500 and K600 Lighting ...
Page 166: ...161 ...
Page 167: ...162 Disabling ...
Page 168: ...163 26 2 Flow chart K300 and K400 ...
Page 169: ...164 ...
Page 170: ...165 Disabling ...