
SBC Processor
S.8 SBc p
RoceSSoR
R
eMoVAL
t
ooLS
n
eeded
:
• 2mm Hex Driver
• Module Pullers (2)
• No.1 Posidriver
• Small flat-blade screwdriver – for connector (A5)
p
RocedURe
1. Shutdown and then switch off the console at both power input panels. Remove both input power leads.
2. The SBC control computer is located in the console’s centre section. (Consoles with redundant processing will
have an additional computer assembly located in channel bay 1–8). To gain access to the SBC control computer(s)
it will first be necessary to remove the appropriate channel/centre TFT screen and also the channel/centre control
tile. Refer to sections S.2 – S.5 for TFT and tile removal information.
3. Remove the connector (A1)
‘POWER’
as indicated in diagram S8-1.
4. Remove the RJ45 network lead at (A2)
‘IP NET’
.
This gives easier access to the four fixing screws (B).
(B)
(B)
(B)
(A1)
‘POWER’
(A2)
‘IP NET’
(A3)
‘ITX 1’
(A4)
‘ITX’
(A5)
‘ITX’
(A6) VGA
(B)
S.8-1
Page 7-8
|
Section 7: Service Information
C10 HD Installation Manual
Summary of Contents for C10 HD
Page 16: ...Page 1 6 Section 1 Introduction C10 HD Installation Manual C10 HD Introduction ...
Page 77: ...Installation C10 HD Installation Manual Section 3 Installation Page 3 27 ...
Page 78: ...Installation Page 3 28 Section 3 Installation C10 HD Installation Manual noteS ...
Page 119: ...C10 HD Installation Guide Section 4 Configuration Page 4 37 B Console Configuration ...
Page 120: ...Page 4 38 Section 4 Configuration C10 HD Installation Guide B Console Configuration ...
Page 218: ...Page 6 32 Section 6 Appendices C10 HD Installation Manual ...
Page 232: ...Specifications Page 7 10 Section 7 Service Information C10 HD Installation Manual ...