8
LCR FITNESS BIKE
HARDWARE STEP 3
#68. 5/16” x 5/8”
Hex Head Bolt (8 pcs)
#76. 5/16” x 18 x 1.5T
Flat Washer (6 pcs)
#82. 5/16” x 1.5T
Split Washer (2 pcs)
#83. 5/16” x 19 x 1.5T
Curved Washer (2 pcs)
1. Slide the Console Mast Cover (31) onto the Console Mast (2). Make sure the
plastic cover is in the correct orientation
2. Feed the twist tie that is connected to the Computer Cable (44) and Hand
pulse Cable (45) through the bottom of the Console Mast (2) and out through
the opening at the top.
3. Insert the Console Mast (2) into the receiving tube (make sure it is oriented
like the illustration; be careful not to pinch the cables between the tubes,
as damage to the electronics could occur) of the Main Frame (1) with six
Hex Head Bolts (68), four Flat Washers (76) on the sides of the tube and two
Curved Washers (83) on the front of the tube. Tighten using the 12/14mm
Wrench (112).
4. Remove the white Styrofoam pad (factory installed to prevent bolts from
being accidentally dropped into the Bike).
5. Remove the plastic tie that holds the plastic cover on the center of the
handlebar (3). Attach the Console Mast Handle bar Assembly (3) onto the
Console Mast (2) with two Hex Head Bolts (68), two Flat Washers (76) and two
Split Washers (82) using the 12/14mm Wrench (112).
CONSOLE MAST
3
Summary of Contents for LCR Fitness Bike
Page 28: ......