24
25
Installation
grid
EV-Charger
5.5 CT connection
L line
CT
Public grid
electricity
Notice: The arrow on the CT
must point at the public grid.
Diagram:
-Steay the CT on the public grid.
-Insert the other end of the communication cable and the terminal of CT on each
side of the adapter.
Installation
Installation
• Do not place the CT on the N Wire or the PE wire.
• Do not place the CT on the N and L wire simultaneously.
• Do not place the CT on the non-insulated wires.
• When
using
the
three
-
phase
CT
p
lease clip the CT clamps on the
,
corresponding phases.
NOTE!
Electrical
grid
other home Load
PV array
Electricity meter,
bidirectional
Three-phase Inverter
L1
N
L2
L3
AC breaker
PE