Production
: The meter is installed at the inverter
output and reads the energy produced by the
inverter.
Ext. Production
: The meter is used for export
limitation with 3rd party generators and for AC
coupling with non-SolarEdge inverters.
Import
: The meter is installed at the grid
connection point and reads the import energy.
None
: No reading
The selected option is displayed in the RS485 Conf
screen as <E+I>, <E>, <Cons>, <Prod>, <I>,
<None>.
Select
Topology: Wye
If relevant, select
PT Scaling
and set the potential
transformer ratio. The default value is 1.
10. Exit Setup mode.
Energy Meter with Modbus Connection Installation Guide MAN-01-00269-1.5
38
Device Configuration