HANDLING AND SAFETY INSTRUCTIONS
Inverter Transport and Storage
Chapter 2: Installing the Power Optimisers
Step 1: Mounting the Power Optimisers
Step 2: Connecting a PV module to a Power Optimiser
Step 3: Connecting Power Optimizers in Strings
Step 4: Verifying Proper Power Optimiser Connection
Chapter 3: Installing the Inverter
Selecting a Residual Current Device (RCD)
Chapter 4: Installing the Battery (Optional)
Chapter 5: Connecting the Inverter
Connecting the Inverter to AC Grid
Connecting the DC Strings to the Inverter
Connecting the Battery (Optional)
Connecting the Backup Interface (Optional)
Connecting an External CT to the Energy Meter (Optional)
Connecting Multiple Inverters through RS485
Chapter 6: Activating, Commissioning and Configuring the System
Step 1: Activating the Installation
Step 2: Commissioning and Configuring the Installation
Step 3: Verifying Proper Activation and Commissioning
Single Phase Energy Hub Inverter MAN-01-00812-1.1
4
Revision History
Summary of Contents for Energy Bank