![SolarEdge Energy Bank Installation Manual Download Page 31](http://html1.mh-extra.com/html/solaredge/energy-bank/energy-bank_installation-manual_1313696031.webp)
Chapter 4: Installing the Battery (Optional)
Install the battery in accordance with the manufacturer instructions.
In addition, follow these guidelines:
Make sure the battery's circuit breaker switch is OFF.
Measure the necessary length between the and the battery for all cables.
Mark polarity on DC cables.
Single Phase Energy Hub Inverter MAN-01-00812-1.1
30
Chapter 4: Installing the Battery (Optional)
Summary of Contents for Energy Bank
Page 68: ......