
104
16. SETTING-OUT LINE
4. Press
[OK]
to return to the screen
in step 2.
•
[MOVE]
: Permanently moves
the baseline coordinates by the
amount set in <Baseline offset>.
5. Press
[OK]
on the screen of step
2. The coordinate value of the
required point is calculated, taking
into account the movement of the
baseline, and displayed.
Setting-out line line measurement tells how far horizontally the measured point is
from the baseline and how far vertically the measured point is from the connected
line. The baseline can be offset in a horizontal direction if necessary.
• Before performing setting-out line line, the baseline must be defined.
PROCEDURE
1. Select “Line” in <Set-out line>.
16.3 Setting-out Line Line
S e t - o u t l i n e
9.662
102.482
N
E
Z
185.675
REC
S-O
Baseline
Measured Point
Offset (horizontal direction)
Offline (--)
Length
1st Pt.
2nd Pt.
Measured Point
Cut
Profile View
S e t - o u t l i n e
P o i n t
L i n e