pg. 7
NOTE
: A
Softub Exterior Tub Cover
is highly recommended if installing your Softub outdoors. See
Maintenance (pg19)
– Solar Exposure.
INDOOR INSTALLATION
Water splashing on the floor during use may cause a walking hazard and/or structural damage unless good
drainage is provided. Proper building materials must be used in the area surrounding and beneath the tub.
Take into consideration the room humidity, which will exist due to higher water temperature. Providing natural
or forced ventilation in the room will help maintain comfort and minimize moisture damage to the surrounding
environment. Consult an architect for aid in designing your indoor Softub room.
SET-UP CHECKLIST
________ 1. All Softub models come with locking straps. Be sure to place the safety straps in a
“
+
”
fashion under the tub prior to filling, to match up with locks on bifold lid.
________ 2. Set the HydroMate
®
beside the Softub on the same level surface. Align the hoses from
the HydroMate
®
with the fittings on the tub.
________ 3. Place the clamps over the hose so that the drive nut is on the top of the hose, the head
facing the direction most easily accessible to tighten.
________ 4. Push the HydroMate
®
towards the tub while guiding the hoses over the tub
fittings. Push together until the end of the hose is flush with the back end of the black
fitting on the tub. Then connect the airline (smaller) hose.
________ 5. Slide the hose clamps towards the tub. The hose clamp should be 2 cm (3/4 inch) from the end
of the hose. Tighten the hose clamps with a nut driver or straight slot screwdriver.
________ 6. Connect light wires if Softub is equipped with LED lighting.
________ 7. With tub and HydroMate
®
connected, make sure placement allows easy access to all
components BEFORE beginning to fill tub. Adjust tub and HydroMate
®
placement, if
necessary.
________ 8. DO NOT PLUG IN THE HYDROMATE
®
until the tub has been completely filled.
________ 9. Before adding water, smooth out all wrinkles from bottom of tub by pushing liner to tub
wall. Softub 300: line up top seam of seat liner as close as possible to the edge of the
seat.
________ 10. Add 5 cm (2 inches) of warm water (not over 38°C - 100.4°F) and work out remaining wrinkles on
the bottom then continue filling.
Softub 300: Push wrinkles out in front and top of seat. Hold liner in corners of the seat
until water has completely covered the seat.
________ 11. Fill remainder of Softub until water is 5 cm (2 inches) above the highest jet.