HYD 5-20KTL-3PH
User manual
Copyright ©Shenzhen SOFARSOLAR Co., Ltd
- 20 -
Checking Deliverables
After unpacking the inverter, check whether deliverables are intact and complete. If
any damage is found or any component is missing, contact the dealer.
Table4-1Components and mechanical parts that should be delivered
NO.
Picture
Description
Quantity
1
Inverter
1pcs
2
Wall hanger
1pcs
3
PV+ input terminal
4pcs
4
PV- input terminal
4pcs
5
Metal terminals secured
to PV+ input power
cables
4pcs
6
Metal terminals secured
to PV- input power
cables
4pcs
7
BAT- input terminal
2pcs
8
BAT+ input terminal
2pcs
9
Metal terminals secured
to BAT- input power
cables
2pcs
10
Metal terminals secured
to BAT+ input power
cables
2pcs
11
M6 Hexagon screw
2pcs
12
M8*80 Expansion bolts used to
secure the wall-mount bracket
to the wall
4pcs