HYD 5-20KTL-3PH
User manual
Copyright ©Shenzhen SOFARSOLAR Co., Ltd
- 17 -
3.8. On-Grid Unbalanced Output
1) The normal load is single phase.
2) The three phases of normal load are the same or unbalanced.
This is the best solution to satisfy your needs.
Fig. 3-9 On-Grid Unbalanced Output
AMASS-
Storage
Battery
Normal Load 3
WiFi/GPRS
,
RS485,USB,CAN2.0
Grid
Critical Load
Power Generation Date
Monitoring Platform
Hydbrid Inverter
Primary
PV panels
Smart Meter
1KW
3KW
5KW
6KW
Normal Load 2
Normal Load 1
4.66KW
2.66KW
0.66KW
0.34KW
0.34KW
0.34KW
2KW