SOFAR 7K~10.5KTLM-G3
User manual
Copyright © Shenzhen SOFAR SOLAR Co., Ltd
- 16 -
6
5mm Allen Wrench
Turn the screw to connect rear
panel with inverter.
7
Crimping tool
Used to crimp power cables
8
Multi-meter
Used to check grounding
9
Marker
Used to mark signs
10
Measuring tape
Used to measure distances
11
Level
Used to ensure that the rear panel
is properly installed
12
ESD gloves
Operators wear
13
Safety goggles
Operators wear
14
Anti-dust respirator
Operators wear
3.4. Determining the Installation Position
Determine an appropriate position for installing the SOFAR 7K~10.5KTLM-G3
inverter. Comply with the following requirements when determining the
installation position: