4 INSTALLATION REQUIREMENTS
IMPORTANT: It is the user’s responsibility to provide a satisfactory installation
area for the lift. Lifts should only be installed on level concrete floors with a
minimum thickness of five (5) inches or 130 mm. Concrete must have a minimum
strength of 4000 psi or 30 MPa and should be aged thirty (30) days prior to
installation. Please consult the architect, contractor or engineer if doubt exists as to
the strength and feasibility of the floor to enable proper lift installation and
operation.
It is the user’s responsibility to provide all wiring for electrical hook-up prior to
installation and to insure that the electrical installation conforms to local building
codes. Where required, it is the user’s responsibility to provide an electrical
isolation switch located in close proximity to the lift that will enable emergency stop
capability and isolate electrical power from the lift for any servicing requirements.
Tools Required:
a.
16ft. Measuring Tape
b. Chalk
Line
c.
Rotary Hammer Drill
d.
3/4” diameter Masonry Drill Bit
e. Hammer
f.
SAE Wrenches and Ratchet Set
g. 2ft.
Level
h. 4ft.
Level
I. Crow
Bar
j.
One 12ft. Step Ladder
k. Side
Cutters
l. Screwdrivers
m.
15 ft. Bleeder Hose (Clear) w/ 3/8”JIC Swivel F fitting on one end
n.
4” x 4” Wooden Blocks (for unpackaging)
Summary of Contents for EELR326A
Page 8: ...7 5 2 BAY LAYOUT Figure 3 Bay Layout ...
Page 10: ...9 Figure 4 Safety Shut Off Bar Installation Figure 5 Safety Shut Off Bar Power Side ...
Page 24: ...23 8 PARTS MANUAL 8 1 LIFT ASSEMBLY ...
Page 27: ...26 8 3 HYDRAULIC SYSTEM ...
Page 29: ...28 8 5 POWER PACK 6 2055 AB 1381 208 230V 1PH 60Hz ...