DECO FRAME - INSTALLING T-POSTS & FRAMES

4-SIDED L-FRAME - GETTING STARTED

Tools & Parts

First, make sure you have all the parts and tools required to install your shades. 

HARDWARE YOU’LL NEED: 
Pencil, ¼" nut driver, level, and a drill with a 

1

16

" drill bit.

RECOMMENDED TOOLS:

Nail gun or drill, tape measure, level, box knife, Phillips head screw driver. Make sure ITEM 
# (

A

) matches on both panel box and frame box. Each window will have 1 box for shutter 

panels and 1 box for frames. 

•  Do not dispose of packaging until the shutters are operating appropriately. 

•  Use of a moving blanket or drop cloth is recommended.

•  Find ample working space to assemble your frame, (preferably in front of the window)

•  Check the diagram to make sure you have all the parts indicated for an appropriate 

installation.

A

A

    

HINGE SCREW

HINGEPIN

    

HOFFMAN KEY

HINGE SPACER

NAIL GUN

Installing T-Posts

The top and bottom of the t-post are 

labeled, locate and identify. 

Line up the pre-drilled holes with the 

top  frame  and  secure  with  screws 

provided. (Repeat for bottom frame)

Tip: It is recommended to use a 6” extension to 
avoid damaging the face of the Deco frame.

Position  the  assembled  frame 

evenly around the window opening 

&  secure  with  nail/screw  into  the 

upper left frame ONLY. Shutter will 

be fully secured in later steps.

USING SCREWS, only secure (1) one 

screw into the top LEFT frame.

USING  NAIL  GUN,  only  secure  (1) 

one nail into the top LEFT frame.

Tip: The 

5

/

8

” light block of the frame is designed 

to sit inside the window opening.

Leveling the Frame

 Once  the  left  side  is  secured,  level 

the frame on the window and secure 

with nail/screw into the upper right 

frame.  Shutter  will  be  fully  secured 

in later steps.

USING SCREWS, only secure (1) one 

screw into the top RIGHT frame.

USING  NAIL  GUN,  only  secure  (1) 

one nail into the top RIGHT frame.

ONCE THE TOP, RIGHT & LEFT FRAME ARE 
SECURED, PANELS CAN BE INSTALLED. 

NOTE: If not installing a T-POST skip to Leveling the Frame.

SCREWS

SCREWS

NAIL GUN

Summary of Contents for Eco-Wood Shutters

Page 1: ...Deco Frame L Frame Z Frame Direct Mount and Hang Strips Eco Wood Shutters STEP BY STEP INSTALLATION INSTRUCTIONS...

Page 2: ...nday Friday 6am 6pm PT Saturday Sunday 7am 4pm PT smithandnoble com Everything You Need TABLE OF CONTENTS Deco Frame Getting Started 3 Assemble Frames 4 Installing T Posts Frames 5 Installing Panels 6...

Page 3: ...rt screwdriver into slot under filler strip CAREFULLY lift up on the screwdriver to separate frame from filler strip Slide finger along frame to safely release the filler strip Completely remove the f...

Page 4: ...The top and bottom of the t post are labeled locate and identify Line up the pre drilled holes with the top frame and secure with screws provided Repeat for bottom frame Tip It is recommended to use...

Page 5: ...Set Hoffman Key round side up and push top frame down onto the Hoffman Key Repeat this step for remaining corners before completing the frame assembly TIP The Hoffman Key has a rounded and a flat sid...

Page 6: ...t to angle the drill gun or nail gun to ensure contact with a stud around the window opening Leveling the Frame Once the left side is secured level the frame on the window and secure with nail screw p...

Page 7: ...RS SCREWS SCREWS NAIL GUN NAIL GUN ENSURING THE REVEAL IS EVEN MAKE A SMALL MARK ALONG YOUR FRAME FOR REFERENCE ONLY SECURE ONE NAIL INTO THE BOTTOM LEFT FRAME ONLY SECURE ONE NAIL INTO THE BOTTOM LEF...

Page 8: ...ace to assemble your frame preferably in front of the window Check the diagram to make sure you have all the parts indicated for an appropriate installation A A 4 SIDED Z FRAME ASSEMBLE FRAMES Assembl...

Page 9: ...d All Z Frame T Post installations are exactly alike Installing the Frame If SCREWS will be used PRE DRILL in the top left and right frame bottom left and right frame and in the middle of the top and...

Page 10: ...dow opening secure with a nail screw pre drill into the upper left frame ONLY Shutter will be fully secured in later steps USING SCREWS only secure 1 one screw into the top LEFT frame USING NAIL GUN o...

Page 11: ...e even across the top and bottom If panels are not even shift rack your frame left to right until your reveal is even Double check and make sure panels are still even across the top Installing the Bot...

Page 12: ...TOM frames USING NAIL GUN only secure 1 one nail into the TOP BOTTOM frames TIP Move top bottom frame up and down to achieve proper tolerance between panel and frame TIP Move side frames in and out to...

Page 13: ...HINGE SPACER DIRECT MOUNT INSTALLING HINGES Completely install the hinge pin Slide panel to left window jam Note mark on wall jam Panel in the window opening Mark should be made on the wall jam at the...

Page 14: ...e is properly positioned install screws into the center of the top and bottom slotted hinge holes and secure top hinge NOTE Center set screw will be installed in later steps Tip Pre drilling is recomm...

Page 15: ...d in later steps Installing the Right Panels Tip Pre drilling is recommended forpropersetting of screws 6 countersink drill bit works best Place the right shutter panel into the opening and slide into...

Page 16: ...cers Now that your panels and hinges are installed close panels check gaps between panels and around the window opening and adjust accordingly Use Hinge Spacer if side to side adjustment is needed Use...

Page 17: ...your frame preferably in front of the window Check the diagram to make sure you have all the parts indicated for the appropriate type of installation HINGE SCREW LIGHT BLOCK SCREW HINGE PIN FRAME SCR...

Page 18: ...hang strip properly positioned in the opening insert screw in top pre drilled holes and secure left frame to the jam Make sure the hinge barrel is position correctly before securing screw REPEAT for...

Page 19: ...sert hinge pins into all hinges to secure the panel Check gaps between panels and around the window opening adjust accordingly Ideally panels should rest lightly on the sill whenever possible Adjustme...

Page 20: ...ght and left of the frames NOTE Inserts MUST be installed prior to installing the top and bottom light blocks Installing Light Blocks After securing your inserts position the bottom light block flush...

Page 21: ...to your receipt and covers defects in material or craftsmanship Shades or blinds must have been properly installed We reserve the right to determine if your window covering warrants a repair or a rep...

Reviews: