9
10
smithandnoble.com
800.248.8888
4-SIDED L FRAME - INSTALLING & LEVELING FRAMES
4-SIDED L FRAME - INSTALLING PANELS
Install Shutter Panels
Place the shutter panel in the frame,
and insert hinge pins into hinges.
Insert hinge side panel into position
first.
NOTE: If installing 2 panels, insert
left panel first, then right panel.
HINGE PIN
HINGE SCREW
Installing the Frame
Position the assembled frame evenly
around the window opening &
secure with nail/screw (pre-drill) into
the upper left frame ONLY. Shutter
will be fully secured in later steps.
Use your finger to ensure a flush
mount to the window opening. (A)
USING SCREWS, only secure (1) one
screw into the top left frame.
USING NAIL GUN, only secure (1)
one nail into the top left frame.
TIP: It is best to angle the drill gun or nail
gun to ensure contact with a stud around the
window opening.
Leveling the Frame
Once the left side is secured, level
the frame on the window and secure
with nail/screw (pre-drill) into the
upper right frame. Shutter will be
fully secured in later steps.
Use your finger to ensure a flush
mount to the window opening. (B)
USING SCREWS, only secure (1) one
screw into the top RIGHT frame.
USING NAIL GUN, only secure (1)
one nail into the top RIGHT frame.
Once top right & left frame are secured, panel
can be installed.
SCREWS
SCREWS
NAIL GUN
NAIL GUN
HINGE
SIDE
HINGE PIN
A
B
A
B
Adjust Positioning
PLEASE NOTE: the bottom frame
should not be secured at this point.
Once panel has been positioned and
secured with the hinge pins, make
sure shutter panel is even across the
top and bottom.
If panel is not even, shift (rack) your
frame left to right until your reveal
is even.
RACK BACK AND FORTH
BEFORE - NOT LINED UP
AFTER - LINED UP