background image

Parts List:

D - 

1/2” ELBOW (4 PCS)

A -

 

1/2” FLANGE (10 PCS)

B - 

1/2” X 6” CONNECTOR (2 PCS)

F - 

#10 X 1-3/4” SCREWS (40 PCS)

G -

 

PLASTIC  WALL ANCHORS 

(40 PCS) NOTE: Use wall anchors for 

hollow wall application only. Wall 

anchors are not necessary if 

flanges are attached directly to studs.

C - 

1/2” X 12” CONNECTOR (16 PCS)

E - 

1/2” TEE (6 PCS)

1.

12” PIPE (C)

1/2” FLANGE (A)

1/2” FLANGE (A)

1/2” FLANGE (A)

1/2” FLANGE (A)

1/2” FLANGE (A)

12” PIPE (C)

12” PIPE (C)

12” PIPE (C)

12” PIPE (C)

12” PIPE (C)

12” PIPE (C)

12” PIPE (C)

6” PIPE (B)

1/2” ELBOW (D)

1/2” TEE(E)

1/2” TEE (E)

1/2” TEE (E)

1/2” ELBOW (D)

PREPPING THE PIPE

VERY IMPORTANT: These are all authentic malleable iron 
and require necessary cleaning and prepping; do not skip 
this step. 

1. Clean and dry all the parts with gentle soap. 
2. Use a lint-free rag to apply metal polish to the parts.
3. Use metal polish or clear coat paint to seal the dry pipe.

RECOMMENDED 

DRILL WITH  1/8” BIT

FOR WALL ANCHOR

RECOMMENDED 

STUD FINDER

STUD

RECOMMENDED TOOLS

365 4TIER

THANK YOU SO MUCH FOR PURCHASING A PIPE DECOR PRODUCT. IF YOU HAVE ANY TROUBLE PUTTING YOUR KIT 
TOGETHER OR MISSING PIECES PLEASE CONTACT [email protected] FOR ANY HELP AND RETURNS.

Summary of Contents for 365 4TIER

Page 1: ... 6 PIPE B 1 2 ELBOW D 1 2 TEE E 1 2 TEE E 1 2 TEE E 1 2 ELBOW D PREPPING THE PIPE VERY IMPORTANT These are all authentic malleable iron and require necessary cleaning and prepping do not skip this step 1 Clean and dry all the parts with gentle soap 2 Use a lint free rag to apply metal polish to the parts 3 Use metal polish or clear coat paint to seal the dry pipe RECOMMENDED DRILL WITH 1 8 BIT FOR...

Page 2: ... evenly side by side this will help to assure your shelves on both sides are even If flanges do not line up adjust pipe accordingly by tightening or loosening 3 Make sure all flange faces are touching the flat surface evenly this will assure that there are no gaps between any of the flanges on the wall If flanges are not touching flat surface evenly adjust accordingly by tightening or loosening fl...

Page 3: ...ation with the top hole of the flange set in the center of the stud Mark the hole with a pencil Now mark the bottom hole of the bottom flange Place a level between the top mark and the bottom mark Adjust position of the bottom mark so it is vertically level with the top hole mark Stud 6 Using a level mark the top hole for the other bracket assembly in the center of the stud where it will be instal...

Page 4: ...tory to use all 12 00 and 6 00 positioned flange holes to attach bracket to studs 8 Drill a 1 8 pilot hole for all center hole marks 12 00 and 6 00 positions Using a screwdriver not included screw the anchors into the 3 00 and 9 00 positioned marks See Illustration illustration for wall anchor installation 9 Install fully assembled bracket assemblies onto the wall with provided screws Stud 12 00 6...

Reviews: