![SMC Networks LEC-GPR1 Series Operation Manual Download Page 25](http://html.mh-extra.com/html/smc-networks/lec-gpr1-series/lec-gpr1-series_operation-manual_1299796025.webp)
- 24 -
(
PC is prepared by customer)
●
Controller setting software
(
Communication cable, USB cable, conversion unit
)
Caution
Do not pull out the cable between the gateway unit and the cable, or cut off the power
supply to the controller (LEC). Communication is interrupted.
5. 4 CN2: PC/TB connector
The connector which connects the tools teaching box (LEC-T1-3*G*) or PC (LEC-W2) for setting the
controller (LEC.
The data link of the gateway unit and the controller (LEC) data is cut by turning off CN2SW or
stopping data link, and communication with the tool teaching box (LEC-T1-3*G*) for setting the controller
or PC (LEC-W2) becomes possible.
(1) Connecting the teaching box
(2) Connecting PC
※
Refer to
9.CN2
:
TB/PC Power supply connector
for usage.
Caution
Do not start the setting software during data link.
Otherwise, communication error (data link error) is generated with the gateway unit.
Gateway unit
CN2
Teaching box
(
with 3m of cable
)
Gateway unit
CN2CN
2
PC
Conversion unit
Communication cable
USB cable
(
A-miniB type
)
位 置
速 度
100
500
200
1000
50
200
1
2
3
テ スト
テ スト
テ スト
現在 位 置
120.3
現在 速 度
200
mm
mm/s
動 作中
アラーム
モ ニ タ
設 定
位 置
速 度
100
500
200
1000
50
200
1
2
3
テ スト
テ スト
テ スト
現在 位 置
120.3
現在 速 度
200
mm
mm/s
動 作中
アラーム
モ ニ タ
設 定