ASSEMBLE BACK PANEL 

SELECT: 

 

6 x 1.850m Wall Sheets 

1 x 3.020 m Top Plate (Red) 

1 x 3.020 m Bottom Plate (Green) 

72 x 30mm Galv Clouts 

10 x Rivets 

STEP 1: 

 

 

Lay out 1 x Top Plate and 1 x Bottom Plate on a 
flat surface as shown (corner cutouts to face in-
wards).  

STEP 2: 

 

 

Place 6 x 1.850 m wall sheets on top of timber 
Plates with bottom of sheets flush with each oth-
er.  

 

 

Rivet the sheets together on overlaps as shown

.

 

STEP 3: 

 

 

Nail the wall sheets to the Top Plate at each end making sure 
that the top of the sheets are flush with the top of the Top 
Plate and that the sides of the wall sheets overhang the Top 
Plate by 

15mm

 as shown. 

 

 

Check that the Top Plate is straight then nail wall sheets to 
the Top Plate, using two clouts per pan.  

STEP 4: 

 

 

Nail the wall sheets to the Bottom Plate at each end,  

     ensuring that each side of the wall sheets overhangs the                           

Bottom Plate by 

15mm

 and that the distance between  

     the Top and Bottom Plates is correct. (As shown) 
 

 

Check that the Bottom Plate is straight then nail   

     wall sheets to the Bottom Plate, using two clouts per pan

.

 

Std Shed —

 

Bottom Plate will protrude below wall sheet by 

approximately 10mm.  
 
Raised base plate shed —

 

Wall sheet will protrude below 

the Bottom Plate by 20mm

TOP PLATE 

BOTTOM PLATE 

BOTTOM PLATE 

1811mm 

1811mm 

TOP PLATE 

TOP PLATE 

15mm 

15mm 

1811mm 

1811mm 

BOTTOM PLATE 

15mm 

15mm 

TOP PLATE 

IMPORTANT—IF YOU CHOOSE TO RAISE YOUR TIMBER 

BASE PLATE –READ THE FOLLOWING; 

 

For sheds with Raised Base Plate option only (see page 5), deduct 

30mm from measurement shown between Top and Bottom Plates on 
all wall panels, so cladding protrudes 20mm below bottom plate

Summary of Contents for SS3020

Page 1: ...ASSEMBLY INSTRUCTIONS SS3020 BASE SIZE 3 020m x 2 020m...

Page 2: ......

Page 3: ...cladding used in Smart Store Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above After a storm wash the cladding and the gutters as so...

Page 4: ...heet 1 810 m 3 Weatherstrip 1 810 m 1 TIMBER Barge 1 100 m 4 Bottom Plates H4 Green Front Back 3 020 m 2 Ridge Flashing 1800 m 2 Bottom Plates H4 Green Sides 2 020 m 2 Padbolt Support Front 0 140 m 1...

Page 5: ...de Back Wall Sheets Front Wall Sheets Door Jambs Front Wall Sheet Door Side Flashing Hinge Door Brace Door Top Bottom Channel Ridge Beam Jack Stud Ridge Flashings x 2 5 ASSEMBLE FRONT PANEL 6 ASSEMBLE...

Page 6: ...coming through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bot...

Page 7: ...or as shown Drill and rivet as per dia gram ensuring rivets penetrate into door sheet STEP 4 Rivet door brace flashings onto back of door as shown Where possible rivet from front of door Ensure the do...

Page 8: ...s to the Top Plate at each end making sure that the top corners of the sheets are flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plate by approx 15mm as show...

Page 9: ...ate using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the...

Page 10: ...ing Ensure the doors close properly then fit remaining rivets STEP 3 Place 3 x Wall Sheets on timber plates and rivet the sheets together as shown Ensure that the top of the sheet is flush with the to...

Page 11: ...g someone to support the panels while they are screwed together Before fixing ensure that the Side Panel overlaps the Back Panel Using 4 x 40mm screws 2 per join screw the Top and Bottom Plates togeth...

Page 12: ...the Jack Studs to the underside of the Ridge Beam one at each end fig 1 Turn the Ridge Beam Jack Stud assembly over and place it on the timber Top Plate in a central position Secure with 2 x 75mm scr...

Page 13: ...pan into the Top Plate Repeat at the front ROOF ASSEMBLY CONT 12 STEP 4 Centralise the Roof at the right hand end with the Ridge Beam Using 3 x Weatherseal nails fix roof sheet to the Ridge Beam and f...

Page 14: ...ONAL SMART STORE FLOOR Position the Floor Joists centrally between the side Base Plates and skew nail each end with two 75mm nails Check that the shed is sitting level and square and that the diagonal...

Page 15: ......

Page 16: ...less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Faste...

Reviews: