ASSEMBLE DOORS 

SELECT: 

 

3 x 1.810 m Door Sheets 

2 x 0.945 m  Door Top/Bottom Channels 

2 x 0.495 m  Door Top/Bottom Channels 

4 x 1.810 m Door Side Flashings 

2 x 1.255 m  Door Brace Flashings 

2 x 0.975 m  Door Brace Flashings 

1 x 1.810 m Weatherstrip 

6 x Hinges 

1 x Padbolt Support Flashing 

70 x Rivets 

LARGE DOOR    STEP 1: 

 

 

Lay out door sheets on a flat surface making sure narrow pans 

are on the outside. 

 

 

Slide door top and bottom channels on each  

      end as shown in 

fig. 1

 

 

 

Rivet sheets together. 

STEP 2: 

 

 

Position door side flash-

ings and assemble door 

as shown. 

 

 

Drill and rivet as per dia-

gram, ensuring rivets 

penetrate into door sheet. 

STEP 4: 

 

 

Rivet door brace flashings onto back of door as 

shown. Where possible, rivet from front of door. 

 

 

Ensure the door brace flashings are at least 50mm 

from top and bottom of door, and 10mm from the 

side to clear top and bottom timber plate, when 

hung. 

fig.2 

fig.1 

STEP 3: 

 

 

Attach hinges to door side channel using rivets pro-

vided. 

 

 

Using one rivet, attach padbolt support as shown in 

fig. 2

 

NARROW PANS 

SMALL DOOR: 

 

 

Assemble small door in same way as large door 

using 0.495 m top and bottom channels.  

 

 

Before screwing on 0.975m door braces, attach weather strip 

flashing to back of door side channel using six rivets ensuring it protrudes 

20mm out from door side.

 

 

Summary of Contents for SS3020

Page 1: ...ASSEMBLY INSTRUCTIONS SS3020 BASE SIZE 3 020m x 2 020m...

Page 2: ......

Page 3: ...cladding used in Smart Store Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above After a storm wash the cladding and the gutters as so...

Page 4: ...heet 1 810 m 3 Weatherstrip 1 810 m 1 TIMBER Barge 1 100 m 4 Bottom Plates H4 Green Front Back 3 020 m 2 Ridge Flashing 1800 m 2 Bottom Plates H4 Green Sides 2 020 m 2 Padbolt Support Front 0 140 m 1...

Page 5: ...de Back Wall Sheets Front Wall Sheets Door Jambs Front Wall Sheet Door Side Flashing Hinge Door Brace Door Top Bottom Channel Ridge Beam Jack Stud Ridge Flashings x 2 5 ASSEMBLE FRONT PANEL 6 ASSEMBLE...

Page 6: ...coming through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bot...

Page 7: ...or as shown Drill and rivet as per dia gram ensuring rivets penetrate into door sheet STEP 4 Rivet door brace flashings onto back of door as shown Where possible rivet from front of door Ensure the do...

Page 8: ...s to the Top Plate at each end making sure that the top corners of the sheets are flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plate by approx 15mm as show...

Page 9: ...ate using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the...

Page 10: ...ing Ensure the doors close properly then fit remaining rivets STEP 3 Place 3 x Wall Sheets on timber plates and rivet the sheets together as shown Ensure that the top of the sheet is flush with the to...

Page 11: ...g someone to support the panels while they are screwed together Before fixing ensure that the Side Panel overlaps the Back Panel Using 4 x 40mm screws 2 per join screw the Top and Bottom Plates togeth...

Page 12: ...the Jack Studs to the underside of the Ridge Beam one at each end fig 1 Turn the Ridge Beam Jack Stud assembly over and place it on the timber Top Plate in a central position Secure with 2 x 75mm scr...

Page 13: ...pan into the Top Plate Repeat at the front ROOF ASSEMBLY CONT 12 STEP 4 Centralise the Roof at the right hand end with the Ridge Beam Using 3 x Weatherseal nails fix roof sheet to the Ridge Beam and f...

Page 14: ...ONAL SMART STORE FLOOR Position the Floor Joists centrally between the side Base Plates and skew nail each end with two 75mm nails Check that the shed is sitting level and square and that the diagonal...

Page 15: ......

Page 16: ...less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Faste...

Reviews: