SELECT: 

 

6 x 2.200 m Roof Sheets 

2 x 3.050 m Spouting 

4 x 1.100 m Barges 

2 x 1.800 m Ridge Flashing 

1 x 3.020 m Ridge Beam 

2 x 0.200 m Jack Studs 

8 x 75mm Screws 

45 x 40mm Weatherseal Nails 

66 x Rivets

 

11 

ROOF  ASSEMBLY 

IMPORTANT—FOR SHEDS WITH OPTIONAL CLEAR 

ROOF PANEL 

 

Assemble as below, making sure that the Clear Roof Sheets 
overlap the standard roof sheets on both sides.  
The Clear Roof Panel must be secured to the Top Plate and the 
Ridge Beam. Pre drill and fasten with the 40mm weatherseal 
nails provided.

.

 

STEP 1: 

 

 

Place the Ridge Beam on a level surface and use 2 x 75mm 
screws to secure the Jack Studs to the underside of the Ridge 
Beam, one at each end (

fig. 1

). 

 

 

Turn the Ridge Beam /Jack Stud assembly over and place it on 
the timber Top Plate in a central position.  

 

 

Secure with 2 x  75mm screws through the top of the Jack Studs 
into the Timber Top Plate (

fig. 2

). 

STEP 2: 

 

 

Position the first roof sheet with the centre slots over the 
middle of the Ridge Beam. Gently fold the roof sheet over 
the Ridge Beam so that the ends touch the front & back Top 
Plates.  

 

 

Repeat with second roof sheet. Ensure that slots in ends of 
sheets line up with each other.  

 

 

Rivet sheets together at overlaps ,one  rivet either side of the 
ridge beam (

fig. 3

).  

 

 

Repeat with remaining roof sheets 

JACK STUD

 

TOP PLATE

 

RIDGE BEAM

 

fig. 1

 

fig. 2

 

fig. 3

 

SIDE 

WALL 

FRONT 

WALL 

BACK 

WALL 

SIDE 

WALL 

TOP PLATE 

BOTTOM PLATE 

RIDGE BEAM 

Summary of Contents for SS3020

Page 1: ...ASSEMBLY INSTRUCTIONS SS3020 BASE SIZE 3 020m x 2 020m...

Page 2: ......

Page 3: ...cladding used in Smart Store Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above After a storm wash the cladding and the gutters as so...

Page 4: ...heet 1 810 m 3 Weatherstrip 1 810 m 1 TIMBER Barge 1 100 m 4 Bottom Plates H4 Green Front Back 3 020 m 2 Ridge Flashing 1800 m 2 Bottom Plates H4 Green Sides 2 020 m 2 Padbolt Support Front 0 140 m 1...

Page 5: ...de Back Wall Sheets Front Wall Sheets Door Jambs Front Wall Sheet Door Side Flashing Hinge Door Brace Door Top Bottom Channel Ridge Beam Jack Stud Ridge Flashings x 2 5 ASSEMBLE FRONT PANEL 6 ASSEMBLE...

Page 6: ...coming through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bot...

Page 7: ...or as shown Drill and rivet as per dia gram ensuring rivets penetrate into door sheet STEP 4 Rivet door brace flashings onto back of door as shown Where possible rivet from front of door Ensure the do...

Page 8: ...s to the Top Plate at each end making sure that the top corners of the sheets are flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plate by approx 15mm as show...

Page 9: ...ate using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the...

Page 10: ...ing Ensure the doors close properly then fit remaining rivets STEP 3 Place 3 x Wall Sheets on timber plates and rivet the sheets together as shown Ensure that the top of the sheet is flush with the to...

Page 11: ...g someone to support the panels while they are screwed together Before fixing ensure that the Side Panel overlaps the Back Panel Using 4 x 40mm screws 2 per join screw the Top and Bottom Plates togeth...

Page 12: ...the Jack Studs to the underside of the Ridge Beam one at each end fig 1 Turn the Ridge Beam Jack Stud assembly over and place it on the timber Top Plate in a central position Secure with 2 x 75mm scr...

Page 13: ...pan into the Top Plate Repeat at the front ROOF ASSEMBLY CONT 12 STEP 4 Centralise the Roof at the right hand end with the Ridge Beam Using 3 x Weatherseal nails fix roof sheet to the Ridge Beam and f...

Page 14: ...ONAL SMART STORE FLOOR Position the Floor Joists centrally between the side Base Plates and skew nail each end with two 75mm nails Check that the shed is sitting level and square and that the diagonal...

Page 15: ......

Page 16: ...less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Faste...

Reviews: