STEP 6: 

 

 

Place barge flashings on roof at end of shed ensuring 
the diagonal trimmed end is facing out. 

 

 

Rivet the Barge Flashings to the roof and the side wall, 
using four rivets on top of barge and four into the side 
(

fig.3

).

 

fig.1 

fig.3 

X 4 

X 4 

Barge

 

STEP 3: 

 

 

Ensure shed is sitting level and square. 

 

 

Beginning from the left hand end (looking from front) centralise the Roof sheets on the Ridge Beam.  

 

 

Ensure that the Roof is tight against the Gable Wall Sheets. Nail 1 x 40mm Weatherseal nail through the Pan into 

the Ridge Beam.  

 

 

At the back left hand corner, (from front) line up the ribs on the Roof Sheet with the ribs on the Wall Sheet then 
using 1 x 40mm Weatherseal nail, fix Roof Sheet through the pan into the Top Plate. Repeat at the front

ROOF  ASSEMBLY CONT... 

12 

STEP 4: 

 

 

Centralise the Roof at the right hand end with the Ridge Beam.  

 

 

Using 3 x Weatherseal nails, fix roof sheet to the Ridge Beam and front & back 

Top Plates.   

 

 

Ensure that the Ridge Beam is straight, Nail roof sheets to ridge beam  at each 

overlap, through the pan using 6 x  Weatherseal nails.  

 

 

Ensure the Front and Back Top Plates are straight. Nail the roof sheets to the 
front & back Top Plates, using 1 x nail per pan (

fig.1

). 

fig.2 

SIDE 

WALL 

FRONT WALL 

BACK 

WALL 

SIDE 

WALL 

TOP PLATE 

BOTTOM PLATE 

RIDGE BEAM 

STEP 5: 

 

 

Rivet the 2 ridge flashings together using 4 rivets, 
so total flashing is 3.050m long. Rivet the Ridge 
Flashing to the centre of the roof using 8 x rivets 
as shown (

fig.2

). 

STEP 7: 

 

 

Place spouting in position and rivet to Barge Flashings at 
each end and rivet to roof sheets (1 rivet per 1 sheet). 
Repeat with remaining spouting. 

Summary of Contents for SS3020

Page 1: ...ASSEMBLY INSTRUCTIONS SS3020 BASE SIZE 3 020m x 2 020m...

Page 2: ......

Page 3: ...cladding used in Smart Store Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above After a storm wash the cladding and the gutters as so...

Page 4: ...heet 1 810 m 3 Weatherstrip 1 810 m 1 TIMBER Barge 1 100 m 4 Bottom Plates H4 Green Front Back 3 020 m 2 Ridge Flashing 1800 m 2 Bottom Plates H4 Green Sides 2 020 m 2 Padbolt Support Front 0 140 m 1...

Page 5: ...de Back Wall Sheets Front Wall Sheets Door Jambs Front Wall Sheet Door Side Flashing Hinge Door Brace Door Top Bottom Channel Ridge Beam Jack Stud Ridge Flashings x 2 5 ASSEMBLE FRONT PANEL 6 ASSEMBLE...

Page 6: ...coming through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bot...

Page 7: ...or as shown Drill and rivet as per dia gram ensuring rivets penetrate into door sheet STEP 4 Rivet door brace flashings onto back of door as shown Where possible rivet from front of door Ensure the do...

Page 8: ...s to the Top Plate at each end making sure that the top corners of the sheets are flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plate by approx 15mm as show...

Page 9: ...ate using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the...

Page 10: ...ing Ensure the doors close properly then fit remaining rivets STEP 3 Place 3 x Wall Sheets on timber plates and rivet the sheets together as shown Ensure that the top of the sheet is flush with the to...

Page 11: ...g someone to support the panels while they are screwed together Before fixing ensure that the Side Panel overlaps the Back Panel Using 4 x 40mm screws 2 per join screw the Top and Bottom Plates togeth...

Page 12: ...the Jack Studs to the underside of the Ridge Beam one at each end fig 1 Turn the Ridge Beam Jack Stud assembly over and place it on the timber Top Plate in a central position Secure with 2 x 75mm scr...

Page 13: ...pan into the Top Plate Repeat at the front ROOF ASSEMBLY CONT 12 STEP 4 Centralise the Roof at the right hand end with the Ridge Beam Using 3 x Weatherseal nails fix roof sheet to the Ridge Beam and f...

Page 14: ...ONAL SMART STORE FLOOR Position the Floor Joists centrally between the side Base Plates and skew nail each end with two 75mm nails Check that the shed is sitting level and square and that the diagonal...

Page 15: ......

Page 16: ...less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Faste...

Reviews: