SECURING SHED 

13 

YOUR SMART STORE SENTRY SHED IS NOW COMPLETE. RELAX

…...

 

Secure your shed using Treated Timber Pegs or a Bolt Down Kit 

TIMBER PEGS—WOODEN FLOOR 

 

 

The optional Smart StoreTimber Peg Down Kit includes six H5 treated 
timber pegs that can be hammered into the ground and then attached to 
the Base Plate with stainless steel screws. A Smart Store timber floor can 
then be fitted on top of the Base Plate. 

BOLT DOWN KIT—CONCRETE 

 

 

The optional Smart Store Bolt Down Kit includes 6 x galvanised 
brackets, screws and  dynabolts. 

 

 

Space the brackets evenly around the shed and fix to the Bottom 
Plate and the concrete slab. A 10mm masonry drill bit is required. 

OPTIONAL SMART STORE FLOOR 

 

 

Position the Floor Joists centrally between the side 
Base Plates and skew nail each end with two 75mm 
nails. 

 

 

Check that the shed is sitting level and square and 
that the diagonal Bottom Plate measurements are the 
same. 

 

 

Place the floor boards in position and nail securely  

     (10 x 50mm nails per board). 

IMPORTANT—

 

CLEAN UP 

 

REMOVE ALL DRILL FILINGS FROM ROOF, WALLS AND CHANNELS 

THOROUGHLY. FAILURE TO DO THIS WILL RESULT IN CORROSION 
AND COULD THEREFORE VOID THE WARRANTY

FIT PADBOLT

 

 

 

Rivet Padbolt to door and keeper onto Door Jamb as 
shown. 

FRONT BASE PLATE

 

BACK BASE PLATE

 

JOIST

 

JOIST

 

JOIST

 

FIT BACK PADBOLT 

 

 

Rivet back pad bolts to pad bolt supports then rivet pad bolt sup-

ports to back of small door (Top and bottom) 

 

 

Using 10mm drill bit, drill hole into top and bottom  timber plates 

Weatherstrip

 

Edge of 

 

Door

 

Padbolt

 

Support

 

Padbolt

 

Top Plate

 

Summary of Contents for SS3020

Page 1: ...ASSEMBLY INSTRUCTIONS SS3020 BASE SIZE 3 020m x 2 020m...

Page 2: ......

Page 3: ...cladding used in Smart Store Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above After a storm wash the cladding and the gutters as so...

Page 4: ...heet 1 810 m 3 Weatherstrip 1 810 m 1 TIMBER Barge 1 100 m 4 Bottom Plates H4 Green Front Back 3 020 m 2 Ridge Flashing 1800 m 2 Bottom Plates H4 Green Sides 2 020 m 2 Padbolt Support Front 0 140 m 1...

Page 5: ...de Back Wall Sheets Front Wall Sheets Door Jambs Front Wall Sheet Door Side Flashing Hinge Door Brace Door Top Bottom Channel Ridge Beam Jack Stud Ridge Flashings x 2 5 ASSEMBLE FRONT PANEL 6 ASSEMBLE...

Page 6: ...coming through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bot...

Page 7: ...or as shown Drill and rivet as per dia gram ensuring rivets penetrate into door sheet STEP 4 Rivet door brace flashings onto back of door as shown Where possible rivet from front of door Ensure the do...

Page 8: ...s to the Top Plate at each end making sure that the top corners of the sheets are flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plate by approx 15mm as show...

Page 9: ...ate using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the...

Page 10: ...ing Ensure the doors close properly then fit remaining rivets STEP 3 Place 3 x Wall Sheets on timber plates and rivet the sheets together as shown Ensure that the top of the sheet is flush with the to...

Page 11: ...g someone to support the panels while they are screwed together Before fixing ensure that the Side Panel overlaps the Back Panel Using 4 x 40mm screws 2 per join screw the Top and Bottom Plates togeth...

Page 12: ...the Jack Studs to the underside of the Ridge Beam one at each end fig 1 Turn the Ridge Beam Jack Stud assembly over and place it on the timber Top Plate in a central position Secure with 2 x 75mm scr...

Page 13: ...pan into the Top Plate Repeat at the front ROOF ASSEMBLY CONT 12 STEP 4 Centralise the Roof at the right hand end with the Ridge Beam Using 3 x Weatherseal nails fix roof sheet to the Ridge Beam and f...

Page 14: ...ONAL SMART STORE FLOOR Position the Floor Joists centrally between the side Base Plates and skew nail each end with two 75mm nails Check that the shed is sitting level and square and that the diagonal...

Page 15: ......

Page 16: ...less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Faste...

Reviews: