background image

 

 

 

 

Riverlea Group Ltd warrant that the cladding used in the manufacture of the Smart store shed will not rust within 20 years from the 

date of purchase.

 

 

 

Any liability for product failure that may arise will be limited to repair or replacement of the defective product and will only apply for 

the benefit of the original purchaser. Riverlea Group Limited will not be liable for any consequential loss or damage, labour, or 

transport charges.

 

 

 

This warranty is conditional on:

 

• 

Construction, installation and maintenance being carried out as specified in the Assembly Instruction Manual.

 

• 

The shed being installed in modest inland corrosion zones or areas where the steel corrosion rate is less than 200g/m2          
(as published by Branz).

 

• 

Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase. 

 

 

 

This warranty does not cover the following:

 

• 

Fastenings and fixings.

 

• 

Normal wear and tear, damage by impact or acts of God.

 

• 

Situations where the shed has been used for storage of chemicals, manure or corrosion causing products.

 

• 

Unauthorized modification of the structure, including painting of the cladding.

 

 

Please visit http://www.riverleagroup.co.nz/warranty

-

garden

-

sheds to validate the Warranty on your shed.

 

Click on the Warranty Registration Link and complete all details.

 

 

If you are unable to access the computer, please phone us on 0800 438 274 and one of the customer services team 

will help you to activate the warranty on your garden shed. 

 

 

 

Many thanks, from the Team at Riverlea Group.

 

20 YEAR WARRANTY

 

WARRANTY REGISTRATION

 

Summary of Contents for SM3015

Page 1: ...ASSEMBLY INSTRUCTIONS SM3015 BASE SIZE 3 020m x 1 520m...

Page 2: ......

Page 3: ...cess needs to be adhered to to qualify for the steel warranty of your Duratuf Smart store shed Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as...

Page 4: ...gle 1 935m 2 Side Wall Angle 1 905m 2 Roof 1 720m 6 Door Sheet Narrow 1 940m 3 Door Sides 1 940m 4 Door Jamb 1 980m 2 Door Brace 1 200m 2 Door Brace 0 955 2 Weatherstrip 1 940 1 Barge 1 720m 2 Door To...

Page 5: ...PACK 2 TIMBER DESCRIPTION QTY DIAGRAM Front Back Bottom Plates H4 Green 3 020 m 2 Front Back Top Plate H1 Red 3 020 m 2 Side Wall Bottom Plates H4 Green 1 520 m 2 Side Wall Top Plates H1 Red 1 522m 2...

Page 6: ...LE BACK PANEL 1 LAY FOUNDATION 2 ASSEMBLE DOOR QUICK OVERVIEW 3 ASSEMBLE SIDE PANELS Top Plat Barge Flashing Spouting Roof Sheets Top Plate Side Top Plate Front Bottom Plate Bottom Plate Front Wall Do...

Page 7: ...ng through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom...

Page 8: ...ans are on the outside Rivet sheets together ensuring ends are flush with each other STEP 2 Position door side flashings and 0 945m top and bottom flashings and assemble door as shown ensuring narrow...

Page 9: ...with bottom of sheets flush with each other Rivet sheets together on overlaps as shown STEP 3 Nail wall sheets to the Top Plate at each end making sure that the top of the sheets are flush with the t...

Page 10: ...sing two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the Top...

Page 11: ...correct distance apart and that the sides of the wall sheet overhang the Bottom Plate by 15mm Drill rivet Door Jamb Flashings to wall sheets using four riv Plan View STEP 2 Using 2 x 30mm clouts nail...

Page 12: ...Using 2 x 40mm screws screw Top Plates together in the corner Using 2 x 40mm screws 2 per join screw the Bottom Plates together in the corner STEP 2 Repeat Step 1 with the second Side Panel ensuring...

Page 13: ...all Sheets fig 2 STEP 3 Ensure the Front and Back Top Plates are straight Screw the roof sheets to the front back Top Plates using 1 x Roofing Screw per rib fig 2 STEP 4 Place barge flashings on roof...

Page 14: ...N CORROSION AND COULD THEREFORE VOID THE WARRANTY FIT PADBOLT Rivet Padbolt to door and keeper onto Door Jamb as shown 13 YOUR DURATUF SMART STORE SHED IS NOW COMPLETE RELAX FITTING A SMART STORE FLOO...

Page 15: ......

Page 16: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...

Reviews: