SECURING SHED
Secure your shed using Treated Timber Pegs or a Bolt Down Kit
TIMBER PEGS—WOODEN FLOOR
•
The optional Duratuf Timber Peg Down Kit includes six H5 treated timber
pegs that can be hammered into the ground and then attached to the
Base Plate with stainless steel screws. A Smart store timber floor can
then be fitted on top of the Base Plate if required.
BOLT DOWN KIT—CONCRETE
•
The optional Duratuf Bolt Down Kit includes 6 x galvanised brackets,
screws and dynabolts.
•
Space the brackets evenly around the shed and fix to the Bottom Plate
and the concrete slab. A 10mm masonry drill bit is required.
IMPORTANT—
CLEAN UP
REMOVE ALL DRILL FILINGS FROM ROOF, WALLS AND CHANNELS THOROUGHLY. FAILURE TO DO THIS
WILL RESULT IN CORROSION AND COULD THEREFORE VOID THE WARRANTY
.
FIT PADBOLT
•
Rivet Padbolt to door and keeper onto Door Jamb as shown.
13
YOUR DURATUF SMART STORE SHED IS NOW COMPLETE. RELAX
…...
FITTING A SMART STORE FLOOR KIT (OPTIONAL)
•
Position the Floor Joists centrally between the side Base Plates and
skew nail each end with two 75mm nails.
•
Check that the shed is sitting level and square . Check that the diagonal
Bottom Plate measurements are the same. This ensures that the shed
base is square.
•
Place the Floor Boards in position. (You may need to cut the last Floor
Board to the correct width using a Skill Saw.) Nail each Floor Board in,
using two 50mm nails each end and two nails into each floor joist.
FRONT BASE PLATE
BACK BASE PLATE
JOIST
JOIST
FIT BACK PADBOLT
•
Rivet back pad bolts to pad bolt supports then rivet pad bolt sup-
ports to back of small door (Top and bottom)
•
Using 10mm drill bit, drill hole into top and bottom timber plates