ROUGH-INS (CONTINUED)
EBF-625 FAUCET WITH BOTH DUAL AND SINGLE LINE WATER SUPPLIES
TOTAL LENGTH OF
SENSOR CABLE IS
24" (610 mm)
3-1/2"
(89 mm)
2-1/2"
(64 mm)
2-3/4" (70 mm)
5-1/4"
(133 mm)
3/4" (19 mm)
2" (51 mm)
1-1/4" (32 mm)
12 o
4-1/2"
(114 mm)
3-1/2" (89 mm)
EBF-655 FAUCET WITH BOTH DUAL AND SINGLE LINE WATER SUPPLIES
TOTAL LENGTH OF
SENSOR CABLE IS
23" (584 mm)
3-1/2"
(89 mm)
2-1/2"
(64 mm)
2-3/4" (70 mm)
5-1/4"
(133 mm)
3/4" (19 mm)
2" (51 mm)
1-1/4" (32 mm)
12 o
4-1/2"
(114 mm)
3-1/2" (89 mm)
PRIOR TO INSTALLATION
prior to installing the Sloan EBF-625 or EBF-655 faucet, install the items listed
below.
• lavatory/Sink
• Drain line
• hot water and Cold water or Tempered water Supply lines
imporTaNT:
• all plumBiNg iS To BE iNSSTallED iN aCCorDaNCE wiTh
appliCaBlE CoDES aND rEgulaTioNS
• FluSh all waTEr liNES prior To maKiNg CoNNECTioNS
mixiNg ValVE
when installation includes one of Sloan’s mixing Valve, these instructions aND
those included with the mixing valve muST be followed.
The Sloan EBF-625 and EBF-655 battery powered sensor activated faucets can
be supplied with two Bak-Cheks. when connecting the faucet to a hot and cold
water supply, two Bak-Cheks are required. water temperature can be con-
trolled by adjusting the supply stops. when connecting the faucet to a single
line water supply or a pre-tempered water supply, a Bak-Chek is not required.
1 - INSTALL BAK-CHEK TEE (OPTIONAL)
The Sloan Bak-Chek is designed for installation on a 3/8” supply stop.
if an existing stop is used, the stop may require replacement or additional
fittings not supplied by Sloan for connection of the Bak-Chek to the hot
and cold water supply lines. Supply stops should be furnished by the
installer.
after flushing the water supply lines through the stops, use a
compression nut and compression sleeve to connect inlet end of
Bak-Chek to the Supply Stop.
NoTE: Failure to install the Bak-Chek can result in a cross flow
connection when the faucet is in the off position and the supply stops
are open. if the pressures of the hot water supply and the cold water
supply are different, hot water can migrate into the cold water supply
or cold water can migrate into the hot water supply. most plumbing
codes require that the Bak-Chek be used to prevent this occurance.
A
B
3/8” (10 mm)
BAK-CHEK TEE
3/8” (10 mm)
SUPPLY TUBE
3/8” (10 mm)
COMPRESSION FITTING