INSTALLATION INSTRUCTIONS FOR 

SENSOR ACTIVATED ETF-600/610 LAVATORY FAUCETS

LIMITED WARRANTY

Sloan Valve Company warrants its ETF-600 and ETF-610 Faucets to be made of first class materials, free from defects of material or workmanship under normal use and to perform
the service for which they are intended in a thoroughly reliable and efficient manner when properly installed and serviced, for a period of three (3) years (one (1) year for special
finishes) from date of purchase. During this period, Sloan Valve Company will, at its option, repair or replace any part or parts which prove to be thus defective if returned to Sloan
Valve Company, at customer's cost, and this shall be the sole remedy available under this warranty. No claims will be allowed for labor, transportation or other incidental costs. This
warranty extends only to persons or organizations who purchase Sloan Valve Company's products directly from Sloan Valve Company for purpose of resale.

THERE ARE NO WARRANTIES WHICH EXTEND BEYOND THE DESCRIPTION ON THE FACE HEREOF. IN NO EVENT IS SLOAN VALVE COMPANY RESPONSIBLE FOR ANY CONSEQUENTIAL DAMAGES OF ANY

MEASURE WHATSOEVER.

Prior to installing the Sloan ETF-600 or ETF-610 Faucet, install the items
listed below. Refer to Rough-in illustrations on Page 2.
• When Using Plug-In Transformer — Install electrical receptacle for plug-

in transformer (120 VAC, 2 amp service for each ETF-233 (24 VAC, 
35 VA) plug-in transformer used).

• When Using Box Mount Transformer — Install electrical wiring to

transformer location (120 VAC, 2 amp service for each EL-248-40 
(24 VAC, 40 VA) transformer used).

• Lavatory/sink
• Drain line
• Hot and cold water supply lines or tempered water supply line

Multiple Faucets
Multiple faucets can be powered by a single transformer, provided that the
transformer has been properly sized. Allow a minimum of 15 VA of current
rating for each solenoid valve used. Refer to “Step 4 — Install Transformer”
for further information.

Mixing Valve
When installing the faucet with a Sloan mixing valve, these Installation
Instructions AND the Installation Instructions packaged with the mixing valve
MUST be followed.

Important:
• INSTALL ALL ELECTRICAL WIRING IN ACCORDANCE WITH

NATIONAL/LOCAL CODES AND REGULATIONS.

• INSTALL ALL PLUMBING IN ACCORDANCE WITH APPLICABLE CODES

AND REGULATIONS.

• A 24 VAC STEP-DOWN TRANSFORMER MUST BE USED.
• USE APPROPRIATE PRECAUTIONS WHILE CONNECTING TRANSFORMER

TO 120 VAC POWER SOURCE.

• DO NOT PLUG TRANSFORMER INTO POWER SOURCE (RECEPTACLE)

UNTIL ALL WIRING IS COMPLETED. ALLOWING 24 VAC TRANSFORMER
WIRES TO TOUCH OR SHORT WHILE POWER IS BEING SUPPLIED WILL
CAUSE PERMANENT DAMAGE TO THE TRANSFORMER AND CIRCUIT
CONTROL MODULE.

• KEEP THREAD SEALANT OUT OF YOUR WATERWAY TO PREVENT

COMPONENT PART DAMAGE! DO NOT USE ANY SEALANT ON
COMPRESSION FITTINGS. FOR THREADED PIPE FITTINGS, DO NOT
APPLY SEALANT TO THE FIRST TWO “STARTER” THREADS.

• FLUSH ALL WATER LINES UNTIL WATER IS CLEAR BEFORE CONNECTING

SOLENOID TO SUPPLY STOPS.

DO NOT INSTALL THE SPRAY HEAD UNTIL AFTER THE SUPPLY LINES HAVE
BEEN FLUSHED.

Model ETF-600

24 VAC, Sensor Activated, 4” Centerset

Lavatory Faucet

Model ETF-610

24 VAC, Sensor Activated

Pedestal Lavatory Faucet

PRIOR TO INSTALLATION

BAK-CHEK

®

TEE USAGE

When connecting the Sloan ETF-600 or ETF-610 Faucet to both hot and cold water supplies, a Bak-Chek

®

Tee is provided and required as illustrated in the

Rough-in drawings on Page 2. Water temperature can be controlled by adjusting the supply stops.
When connecting the faucet to a single line water supply or a pre-tempered water supply, a Bak-Chek

®

Tee is not required.

A Bak-Chek

®

Tee is not required or provided when a Temperature Mixing Valve is included with the faucet.

TOOLS REQUIRED FOR INSTALLATION

• Open end wrenches for hex sizes:  1”, 5/8”,

9/16”, 1/2”

• Slotted screwdriver, 3/16”

• Basin wrench
• Slotted screwdriver (supplied)
• Phillips head screwdriver, #2

• Pliers
• Wire stripper/crimping tool

Summary of Contents for Optima ETF-600

Page 1: ...f 15 VA of current rating for each solenoid valve used Refer to Step 4 Install Transformer for further information Mixing Valve When installing the faucet with a Sloan mixing valve these Installation...

Page 2: ...ASE GASKET Note Refer to the Installation Instructions included with the ETF 578 A Trim Plate for additional information about using an 8 Trim Plate with an ETF 600 faucet Apply thread sealant or Tefl...

Page 3: ...PLY SOLENOID VALVE 1 4 PIPE TO 3 8 TUBE COMPRESSION FITTING 3 8 SUPPLY TUBE NOT SUPPLIED 3 8 BAK CHEK COMPRESSION TEE FOR APPLICATIONS USING DUAL WATER SUPPLY ETF 600 ETF 610 3 8 10 mm SUPPLY TUBE 3 8...

Page 4: ...ommended A Run wires from secondary side of Transformer to 3 8 inch 10 mm hole at back of Control Module Enclosure If necessary wires can be run through wall and then inserted through hole in back of...

Page 5: ...NAL BLOCK 2 INSERT POWER CABLES 3 SECURE WITH SCREWS 4 REINSTALL TERMINAL BLOCK CONNECTOR BOARD POWER CABLE MODULAR RECEPTACLE B Insert Solenoid Valve Connector into the Modular Receptacle on Connecto...

Page 6: ...3 Dip Switches as shown in Table 1 Table 1 Time Out Settings Unless otherwise specified all ETF 600 ETF 610 Faucets leave the factory set with a 30 second Time Out Note The position of Dip Switch 4 ra...

Page 7: ...ates BUT does NOT change to RED when hands are placed in the Sensor s detection zone CAUSE Sensor range is set too short SOLUTION Increase Sensor detection range CAUSE Sensor is faulty SOLUTION Replac...

Page 8: ...Strain Relief and Crimp Connectors Transformer to Control Module OPTIONAL TRIM PLATES 13A ETF 607 A 4 102 mm Centerset Single hole Trim Plate Kit for ETF 610 Faucet 13B ETF 608 A 8 203 mm Centerset S...

Page 9: ...supply lines or tempered water supply line Mixing Valve When installing the faucet with a Sloan Mixing Valve these Installation Instructions AND the Installation Instructions packaged with the Mixing...

Page 10: ...lves for Hot and Cold Water Supply shown with 4 trim Plate ADAPTER OPTIONAL ADAPTER OPTIONAL ADAPTER OPTIONAL ADAPTER OPTIONAL ADAPTE OPTIONA ADAPTER OPTIONAL ADAPTER OPTIONAL ADAPTER OPTIONAL ADAPTER...

Page 11: ...old supply stops Supply tubes and stops furnished by installer Install a 3 8 inch 10 mm copper supply tube between Bak Chek Compression Tee and inlet side of Solenoid Valve Tighten Compression Fitting...

Page 12: ...and Plastic Anchors A Install the Control Module in an appropriate location Control Module must be installed so that all cables enter from the bottom of the unit When installed Cables from the Spout a...

Page 13: ...ts are factory set to operate when hands are placed 4 to 5 inches 102 to 127 mm from Sensor This range should be satisfactory for most installations If range adjustment is required refer to the follow...

Page 14: ...ative finishes Use ONLY soap and water then wipe dry with clean cloth or towel While cleaning the bathroom tile the faucet should be protected from any splattering of cleaner Acids and cleaning fluids...

Page 15: ...Module SOLUTION Disconnect and reconnect Sensor Cable to the Control Module CAUSE Sensor range is set at minimum distance SOLUTION Increase Sensor range Refer to Step 9 Range Adjustment CAUSE Control...

Page 16: ...ludes Base Gasket Spacer Washer 9 16 Lockwasher 1 4 NPSM Hex Nut and ETF 547 Compression Fitting Connector 5 ETF 547 1 8 NPT Pipe to 3 8 Tube Compression Fitting Connector female 6 ETF 617 A 3 8 Bak C...

Page 17: ...ide when installing the Sloan EBF 625 or EBF 655 faucet as always good safety practices and care when installing your new faucet if further assistance is required contact your nearest Sloan representa...

Page 18: ...NG 3 8 COMPRESSION FITTING 3 8 COPPER SUPPLY TUBE NOT SUPPLIED 3 8 COPPER SUPPLY TUBE NOT SUPPLIED SOLENOID VALVE EBF 655 FAUCET WITH SINGLE LINE WATER SUPPLY EBF 625 FAUCET WITH SINGLE LINE WATER SUP...

Page 19: ...hen connecting the faucet to a hot and cold water supply two Bak Cheks are required water temperature can be con trolled by adjusting the supply stops when connecting the faucet to a single line water...

Page 20: ...so that it faces sideways vertically however optimum performance is obtained when the control module is horizontal with the Sloan logo on the cover facing up install the control module in an appropri...

Page 21: ...UBE COMPRESSION FITTING 1 8 PIPE NIPPLE 3 8 SUPPLY TUBE NOT SUPPLIED SOLENOID VALVE 3 8 TEE COMPRESSION FITTING 3 8 SUPPLY TUBE NOT SUPPLIED 3 8 SOLENOID VALVE COMPRESSION FITTING TOP OUTLET 3 8 SOLEN...

Page 22: ...T The opTima plus EBF 625 and EBF 655 faucets are factory set to operate when hands are placed 4 5 102 127 mm from sensor This range should be satisfactory for most installations if range adjustment i...

Page 23: ...the faucet to purge any air from the system lines Check for leaks and repair as necessary OPERATION 1 a continuous invisible beam of infrared light is emitted from the sensor located on the throat of...

Page 24: ...plied to sensor Ensure that the batteries are installed properly Check that the orientation of each battery matches the positive and negative symbols shown on the bottom of the battery compartment rei...

Reviews: