TURBINE INSTALLATION
Please follow the instructions supplied
with your turbine.
Secure turbine to turbine rail via hatch
at bottom of fuselage. Leave gap of
25mm between NGV and tailpipe.
Run all turbine wires and power cables
on opposite side of servo wires.
Always secure all wires in harness. I
would suggest you install a FOD. This
will save you money in the long run.
Install fuel pump close to UAT. We recom-
mend to make use of a mechanical shut off
valve as well.
Secure all Festo pipes with cable ties. Make
sure fuel filter and gas canister are mounted
vertical.
Install NiCad or Li Po battery in nose. I always
put a fuse holder inline with power cable.
A bypass always looks good and improve the aerodynamics of model.
P-23
Assembly & Operation Manual
Photo 62
Photo 66
Photo 64
Photo 63