Assembly & Operation Manual
TAIL PIPE
Dril holes in mounting lugs of tail pipe.
Make 90 degree bend in each mounting lug.
Slide tail pipe through hatch into position.
Silicon belmouth to pipe.
Install bottom bypass and check fit to inlet duct and
pipe.
Trim bypass to clear former if needed. Drill hole in by-
bass and fit tail pipe lugs to bypass and turbine rail.
Glue bellmouth with silicon glue.
Photo 51
Photo 52
FUEL CELL
Rinse the fuel tank and check for leaks.
Make up fuel line clunk. Make sure clunk moves freely
and reaches all corners of inside of tank.
Fit to tank. Mark pipes for “inlet” and “outlet”.
NOTE: Some tygon tubing hardens after a year or so. I
use Robart XL tygon.
Plumb tanks using diagram on next page.
Fill tanks and check for leaks.
Drain tanks with fuel pump and check no air bubbles in
system until last drop is drained. A good plumbing
will secure good turbine operation..
P-19
Photo 53
Photo 54
Photo 55