Section 3 - Operation
Loading/Unloading
3.10-3b Lifting (61T/66T)
1.
Rotate the boom and position the aerial platform
as shown in
Figure 3-15
and
Figure 3-16.
.
2.
Turn main power disconnect switch to “
” off
position.
3.
Clear platform of all personnel, tools and materials.
WARNING
W h e n l i f t i n g t h e a e r i a l p l a t f o r m ,
lifting devices must be attached to
designated lift points only (refer to
Figure 3-16
and
Figure 3-17
).
WARNING
Use chains with load capacity sufficient
to withstand aerial platform weight. Refer
to the serial plate of the aerial platform
for specific weight.
4.
Properly adjust rigging to ensure aerial platform
remains level during lifting. See Center of gravity
location (
Figure 3-15
).
Figure 3-17. 61/66T Lifting Points
Figure 3-16. 61/66T Overhead View Lifting Points
Figure 3-15. 61/66T Center of Gravity
C
L
10”
(0.25m)
Transport/Lift Points
Transport/Lift Points
SJ 40T & SJ 45T
SJ 61T & SJ 66T
Page 61
Summary of Contents for SJ45T
Page 12: ...Page 12 SJ 40T SJ 45T SJ 61T SJ 66T Notes ...
Page 42: ...Page 42 SJ 40T SJ 45T SJ 61T SJ 66T Notes ...
Page 68: ...Page 68 SJ 40T SJ 45T SJ 61T SJ 66T Notes ...
Page 104: ...Page 104 SJ 40T SJ 45T SJ 61T SJ 66T Notes ...
Page 105: ...Cancer and Reproductive Harm https www p65warnings ca gov WARNING ...
Page 106: ...www skyjack com elig lift løsninger av folk som bryr seg ...