101
SJ20
238886ABA
Section 5 – Procedures
Wear Pad Replacement
10.
Fully lower mast 2 onto the chassis.
11.
Lubricate the four wear pads and the two front
corners all the way down mast 2.
12.
Repeat steps 2 through 11 for masts 3 to 4.
5.13-7 Install the mast 5 and bottom wear
pads
1.
Use hoist rings and lifting straps to put mast 5
onto the chassis.
2.
Keep the mast 5 raised so that the bottom part is
visible.
3.
Use new thread rolling screws to attach two new
thin and short wear pads (
234169
) to the rear of
the mas.
Summary of Contents for SJ20
Page 1: ...SERVICE MANUAL VERTICAL MAST LIFTS 238886ABA November 16 2021 ANSI CSA SJ20...
Page 4: ...4 SJ20 238886ABA Notes...
Page 8: ...8 SJ20 238886ABA Notes...
Page 22: ...22 SJ20 238886ABA Notes...
Page 32: ...32 SJ20 238886ABA Notes...
Page 33: ...33 SJ20 238886ABA Section 3 System Component Identification and Schematics...
Page 54: ...54 SJ20 238886ABA Notes...
Page 106: ...106 SJ20 238886ABA Notes...
Page 107: ......
Page 108: ...www skyjack com...