102
SJ20
238886ABA
Section 5 – Procedures
Wear Pad Replacement
4.
Use new pop rivets to attach two new thick and
long wear pads (
234171
) to the front of the mast.
5.
Pull the mast cable out of mast 1 and lower it
between mast 4 and mast 5.
6.
Use the screws removed earlier to mount the
mast electrical housing to the side of mast 5.
7.
Use new pop rivets and the washers removed
earlier to mount the AC outlet box to the side of
mast 5.
Summary of Contents for SJ20
Page 1: ...SERVICE MANUAL VERTICAL MAST LIFTS 238886ABA November 16 2021 ANSI CSA SJ20...
Page 4: ...4 SJ20 238886ABA Notes...
Page 8: ...8 SJ20 238886ABA Notes...
Page 22: ...22 SJ20 238886ABA Notes...
Page 32: ...32 SJ20 238886ABA Notes...
Page 33: ...33 SJ20 238886ABA Section 3 System Component Identification and Schematics...
Page 54: ...54 SJ20 238886ABA Notes...
Page 106: ...106 SJ20 238886ABA Notes...
Page 107: ......
Page 108: ...www skyjack com...