93
SJ20
238886ABA
Section 5 – Procedures
Wear Pad Replacement
7.
Remove and set aside the nut that secures the
ground wire to the chassis. You may need to
remove the chassis cover to access the wire.
8.
Cut the tie wraps that secure the AC power cable
to the cable carrier and existing cable bundles.
9.
Remove and set aside the screws that secure the
mast electrical housing to the mast.
10.
Remove the rivets and washers that secure the
AC outlet to the mast. Set aside the washers.
11.
Remove and set aside the cable clamp and
hardware.
12.
Remove and set aside the cable clips from the
mast cable.
Summary of Contents for SJ20
Page 1: ...SERVICE MANUAL VERTICAL MAST LIFTS 238886ABA November 16 2021 ANSI CSA SJ20...
Page 4: ...4 SJ20 238886ABA Notes...
Page 8: ...8 SJ20 238886ABA Notes...
Page 22: ...22 SJ20 238886ABA Notes...
Page 32: ...32 SJ20 238886ABA Notes...
Page 33: ...33 SJ20 238886ABA Section 3 System Component Identification and Schematics...
Page 54: ...54 SJ20 238886ABA Notes...
Page 106: ...106 SJ20 238886ABA Notes...
Page 107: ......
Page 108: ...www skyjack com...