![background image](http://html1.mh-extra.com/html/skyjack/sj20/sj20_service-manual_1290439100.webp)
100
SJ20
238886ABA
Section 5 – Procedures
Wear Pad Replacement
6.
Pull the mast cable out of mast 1 and start to
lower it between mast 1 and mast 2 until the next
tape marker is at the top of the cable carrier.
7.
Use the three cable clamps removed earlier to
secure the cable to the mast 2 cable carrier.
8.
Raise mast 2 so that the cable loop is visible from
the bottom of the mast.
9.
Put a weighted roller into the cable loop.
Summary of Contents for SJ20
Page 1: ...SERVICE MANUAL VERTICAL MAST LIFTS 238886ABA November 16 2021 ANSI CSA SJ20...
Page 4: ...4 SJ20 238886ABA Notes...
Page 8: ...8 SJ20 238886ABA Notes...
Page 22: ...22 SJ20 238886ABA Notes...
Page 32: ...32 SJ20 238886ABA Notes...
Page 33: ...33 SJ20 238886ABA Section 3 System Component Identification and Schematics...
Page 54: ...54 SJ20 238886ABA Notes...
Page 106: ...106 SJ20 238886ABA Notes...
Page 107: ......
Page 108: ...www skyjack com...