97
SJ20
238886ABA
Section 5 – Procedures
Wear Pad Replacement
5.13-4 Replace the top wear pads
1.
Remove and discard the wear pads at the top of
mast 1.
2.
Use new pop rivets to attach two new thick and
short wear pads (
234170
) to the front of the mast.
3.
Use new pop rivets to attach two new thin and
long wear pads (
234168
) to the rear of the mast.
4.
Repeat steps 2 and 3 for masts 2 through 4.
Summary of Contents for SJ20
Page 1: ...SERVICE MANUAL VERTICAL MAST LIFTS 238886ABA November 16 2021 ANSI CSA SJ20...
Page 4: ...4 SJ20 238886ABA Notes...
Page 8: ...8 SJ20 238886ABA Notes...
Page 22: ...22 SJ20 238886ABA Notes...
Page 32: ...32 SJ20 238886ABA Notes...
Page 33: ...33 SJ20 238886ABA Section 3 System Component Identification and Schematics...
Page 54: ...54 SJ20 238886ABA Notes...
Page 106: ...106 SJ20 238886ABA Notes...
Page 107: ......
Page 108: ...www skyjack com...