SJ 46AJ
December 2007
Page 59
Section 3 - Operation
Chassis Tilt
3.11 Chassis Tilt
This section guides the operator with regard to
recovering from an inclined position.
IMPORTANT
When the boom is raised or extended, the
aerial platform must only be operated on
firm level surfaces.
WARNING
When the aerial platform becomes tilted
causing the alarm to sound, the platform
must be fully lowered and retracted
immediately. Drive functions are not
available when the tilt alarm is active.
3.11-1 Platform Uphill
If the aerial platform becomes tilted with the platform
uphill (refer to
Figure 3-9
) follow the steps below to
return to a lowered and retracted position.
1.
Lower main boom completely.
2.
Lower riser completely.
3.
Retract fly boom completely.
4.
Drive to a firm level surface.
3.11-2 Platform Downhill
If the aerial platform becomes tilted with the platform
downhill (refer to
Figure 3-10
) follow the steps below to
return to a lowered and retracted position.
1.
Retract fly boom completely.
2.
Lower riser completely.
3.
Lower main boom completely.
4.
Drive to a firm level surface.
Figure 3-10. Platform Downhill
Figure 3-9. Platform Uphill
Summary of Contents for SJ 46AJ
Page 1: ...ARTICULATING BOOMS MODELS SJ46AJ 169510AD A November 2015 OPERATING MANUAL ANSI CSA ...
Page 12: ...Page 12 December 2007 SJ 46AJ Notes ...
Page 62: ...Page 62 December 2007 SJ 46AJ Notes ...
Page 92: ...Page 92 December 2007 SJ 46AJ Notes ...
Page 94: ...www skyjack com Pålitelig lift løsninger av folk som bryr seg ...