Installation and initial start-up
6a
TFG 1..: Connect the corresponding operating element to the corresponding con-
trol unit (see relevant operating instructions).
6b
TFG 5.., TFG 9..: Connect the corresponding operating element to the TFG 5.., TFG
9...
Important: Ensure that cables cannot get pinched or damaged. Check that the
mains voltage corresponds to the nominal value on the type plate.
7a
TFG 1..: Connect the corresponding control unit to the mains supply (see applica-
ble operating instructions).
7b
TFG 5.., TFG 9..: Connect the control unit to the mains supply.
8*
Only for TFG 5.., TFG 9..: Check the operating voltage display (green light must
light up).
You can now operate the telescopic pillar, using the corresponding operating element.
Important: SKF Actuation System will not accept liability for any damage caused if
the telescopic pillar TFG is not used with a suitable SKF control unit / operating
element.
Only for TFG 1..: If the telescopic pillar is used with an non SKF control unit, the
control unit must be equipped with an overcurrent protection in order to protect
the telescopic pillar against overload. The pillar must be switched off immediately,
if a current of 5,1 A is exceeded for a maximum of 50 ms. To start the pillars, the
overcurrent circuit breaker must be deactivated for 250 ms. The maximum per-
missible operation time must not be exceeded.