Special operations
The following chapters are part of the special operations:
■
5. Installation and initial start-up
■
6. Maintenance, clearing malfunctions, repairs
■
7. Removing from service, dismantling and disposal
5.
Installation and initial start-up
This chapter is intended for
technicians
and
those doing the further processing
. It
provides all the information that you need to assemble, connect and start up the
telescopic pillar TFG.
Preparation
Good preparation is part of efficient installation and start-up. This includes, among other
things, deciding on a location and having an energy source ready.
Transport
Please note: Immediately after receipt, the pillar is to be examined for cracks and
damage to the control unit housing and any other damage. Any transit damage is
to be notified to the carrier and the manufacturer immediately and in writing.
The telescopic pillar TFG is delivered as a unit in a box or on pallets. Instruct a carrier to
ship the telescopic pillar.
Return to the manufac-
turer
Prepare the telescopic pillar for transport as follows:
1
Dismantle the telescopic pillar as per the instructions in the
chapter.
2
Pack the telescopic pillar carefully.
Please note: You will find weight, dimensions and the environmental requirements
in the technical data in the appendix (
Check items in shipment
The telescopic pillar comprises:
■
a complete guide tube unit with pillar unit
■
pre-assembled control unit housing
■
only for TFG 1..: a cable with a DIN8 plug