![sitrex Action 120 Use And Maintenance Manual Download Page 27](http://html.mh-extra.com/html/sitrex/action-120/action-120_use-and-maintenance-manual_1285841027.webp)
Round Baler ACTION 120
USE AND MAINTENANCE MANUAL - 27 -
Pic. 12A
– Electric signal M50
5.8 ELECTRIC SWITCH-BOARD
“M100” (OPTIONAL)
The whole cycle for binding is managed by an
electric switch-board with the following functions
(Pic. 12B):
1- BUTTON FOR SELECTING TWINE OR
NET
2- BUTTON STARTING BINDER
3- STOP LIGHT FULL CHAMBER
4- FEEDING LIGHT SWITCH BOARD
Pic. 12B
– Electric switch-board M100
5.9 AUTOMATIC SWITCH-BOARD
“M200” (OPTIONAL)
5.9.1 Installation and linkage
The control device has to be installed inside the
tractor and has to be fed by cable. That cable has
to be protected by a 20A fuse, which will be
directly connected with the tractor battery (code
nr. 53006910).
Both the delivery connectors have to be
connected with baler.
WARNING
If the control device will be fed with inverted
polarity, it won’t be possible to switch it on
and display will keep switched off.
5.9.2 Control description
Pic. 12C
– Automatic switch-board M200
The switch-board
“M200” has the following
functions (Pic. 12C):
1- MULTIFUNCTION DISPLAY
On the left-hand side it display selected
binder:
= twine
= net
On the centre it display working procedure:
MAN = Manual
S-AT = Semi-automatic
AUTO = Automatic
On the right-hand side it display bales
counter (total or partial)
2- LED STOP
3- SWITCH ON/OFF
4- COUNTER KEY
It alternate the total counter display with the
display of 4 partial counters (A, B, C, D).
To set at zero the displayed partial
counter press the key for 4 seconds.
5- START KEY
6- MODE KEY
It select working procedure.
During the navigation in MENU give the
possibility to move on the left.