1.5.2. Xroom 250
(XR1-025-EC…)
Box 1 – Xroom unit
-
Xroom unit body with front metal cover
-
installation template with mounting pins
1 pc
1 pc
-
bolt M6x25
5 pc
-
bolt M6x20 with a plastic head
3 pc
-
Quick safety data sheet
1 pc
-
serial plate
1 pc
Box 2 – mandatory installation accessories XR1-025-DUCT-1 (for installation into a wall with thickness of the
max. 500 mm)
-
plastic white tube
Ø
150 mm, length 500 mm
1 pc
-
supply line assembly with damper
Ø
150 mm, length 500 mm
1 pc
-
plastic square outlet with damper
1 pc
-
plastic square outlet without damper
1 pc
-
Self tapping bolt
Ø
4x22
4 pc
-
insulation washer 210x200x5 with hole
Ø
153 mm
2 pc
6. Before Commencing the Installation
-
Before commencing the installation, we recommend that you attach the serial plate (by default, supplied
with the package) to the operating documentation (e.g.: equipment operating book, etc.), which is
subsequently kept for a later maintenance records and servicing.
-
Check that there are no electrical or other lines (e.g. gas, water, etc.) at the point of installation of the
unit on the wall that could be damaged during installation.
-
Make sure that the installation of the unit does not endanger the building’s statics and meets all the
legislative safety requirements.
-
Select how you will drain the condensate:
o
Using supply piping through a facade outlet – standard solution.
o
Using a condensation piece – it is not part of the delivery, must be provided by the customer.
-
If condensate is drained through the facade outlet, check that there would be no damage to the
construction or contact with live equipment.
8
Version 1 – GBR(23/06/2021)
D-502-0152