Fig. 15
3.2.5. Installation of the Supply and Drainage Piping on the unit
-
Move box 1 - the “Xroom unit” back to the assembly area and open it. Do not unpack the unit from the
box.
-
Remove the plastic bag with connecting material from the box (M6x30 bolts, M6x20 bolt with plastic
head) and store it for later use.
-
Apply MS polymer based sealant to the grooves that are along the perimeter of the socket, so that it is
filled up to the edge of the groove.
-
Apply MS polymer based sealant to the outer side of the socket along the entire perimeter.
-
Slide the length-adjusted tube (without damper)
onto the lower socket of the unit by turning it back and
forth while pushing it down into the groove.
-
After fitting the pipe onto the lower socket, check its perpendicularity to the rear part of theunit and the
correct installation
APPLY THE SEALANT AND INSTALL (ENTIRE
CORNER) THE UNIT BODY AND PIPING
DIVISION TO MAKE A CORNER JOINT
3
SECURE THE PIPING WITH SELF-CUTTING
BOLTS FOR INITIAL HANDLING – 2 PCS ON
THE SOCKET AGAINST EACH OTHER
(LOCATION IS 20 mm FROM THE EPP
SOCKET EDGE). CUT OPEN THE BOX, IN
WHICH THE UNIT IS PACKAGED, AND
REMOVE THE UNIT.
4
APPLY THE SEALANT INTO THE GROOVE AND
ON THE OUTER SIDE OF THE SOCKET OF THIS
UNIT.
1
PUSH THE PREPARED PIPING INTO THE
GROOVES, BLUE POINTS MUST FIT –
TUBES
ARE POSITIONED VERTICALLY TO THE UNIT,
2
27
Version 1 – GBR(23/06/2021)
D-502-0152