Select a suitable anchoring material (not included in the delivery) for the wall composition, the diameter
of the holes in the template intended for anchoring the installation template is 7 mm,
-
Drill the marked holes according to the selected anchoring material,
-
Bolt the installation board to the wall,
-
Check that the installation board is level or align it.
3.2.3. Preparation of Piping Holes in the Existing Wall
-
Use the prepared holes in the installation template to correctly align the piping holes. The installation
template is also used as a drilling template.
-
Do not remove the installation template when drilling the piping holes.
-
Use the appropriate technology (core drilling) to drill holes into the wall or approach a specialised
company that performs this service professionally.
-
Core drill (drilled hole) diameter:
o
Xroom 100 (XR1-010…)
o
Xroom 250 (XR1-025…)
Ø
152 mm (hole in installation template
Ø
155 mm)
Ø
182 mm (hole in installation template
Ø
185 mm)
CHECKING THE FLATNESS WITH A
SPIRIT LEVEL
Fig. 10
Fig. 11
1
2
3
4
24
Version 1 – GBR(23/06/2021)
D-502-0152