![Simrad SP90 - REV E Installation Manual Download Page 39](http://html1.mh-extra.com/html/simrad/sp90-rev-e/sp90-rev-e_installation-manual_1279235039.webp)
Installation planning
27
851-164510 / Rev.E
2.3 Sonar room requirements
Size
The sonar room must be dimensioned to house both the Hull
Unit and the Transceiver Unit. This is due to the limited length
of the flexible hose protected cabling (approximately 3.5 m)
connecting these two units.
A well designed sonar room reduces the risk of corrosion and
simplifies maintenance increasing system reliability. The sonar
room should not be unnecessarily obstructed by girders, pipes
etc. which might cause installation problems or impede
maintenance.
Access hatches
The sonar room must be accessible under all conditions at sea or
at a berth. All doors or hatches should be designed so that the
equipment can be removed without being disassembled.
Lifting
An attachment point, rated at a minimum of two -2- tons, for
supporting a lifting device should be located above the Hull
Unit. This permanently installed fixture will facilitate Trunk and
Hull Unit mounting and also may be used for service of the
equipment in the future.
Heating
The sonar room should be equipped with heater, dimensioned to
maintain the equipment within its environmental tolerances (at
least 1000 W), installed close to the deck. Heating is also an
effective method for reducing humidity.
Insulation
Bulkheads must be insulated and provided with an interior wall
to the deck. The insulation should be the minimum equivalent of
50 mm of rock-wool. In addition, piping passing through the
space prone to condensation must be insulated.
Ventilation
The sonar room should be connected to the vessel’s ventilation
system. If this is not possible, two 3-inch vents must be
provided from the sonar room to the main deck.
In the sonar room, the air inlet should be located in close to the
deck and the outlet as high as possible. A funnel shaped
drip-collector should be mounted below the vent pipes to divert
moisture to the bilge.
Summary of Contents for SP90 - REV E
Page 2: ......
Page 12: ...Simrad SP90 VIII 851 164510 Rev E...
Page 62: ...Simrad SP90 50 851 164510 Rev E Figure 10 Mounting the Transceiver Unit CD3110A...
Page 75: ...Cable layout 63 851 164510 Rev E Figure 15 SP90 Cable plan...
Page 214: ...Simrad SP90 202 851 164510 Rev E SP90 Sonar Operating Panel Outline dimensions...
Page 215: ...Drawing file 203 851 164510 Rev E SP90 Sonar Processing Unit MC70 Outline dimensions...
Page 216: ...Simrad SP90 204 851 164510 Rev E SP90 Sonar Interface Unit Outline dimensions...
Page 217: ...Drawing file 205 851 164510 Rev E SP90 Transceiver Unit Outline dimensions...
Page 218: ...Simrad SP90 206 851 164510 Rev E SP90 Standard loudspeaker outline dimensions...
Page 219: ...Drawing file 207 851 164510 Rev E SP92 Hull Unit Outline dimensions...
Page 220: ...Simrad SP90 208 851 164510 Rev E SP93 Hull Unit Outline dimensions...
Page 221: ...Drawing file 209 851 164510 Rev E SP92 SP93 Mounting trunk Page 1 of 2...
Page 222: ...Simrad SP90 210 851 164510 Rev E SP92 SP93 Mounting trunk Page 2 of 2...
Page 223: ...Drawing file 211 851 164510 Rev E SP92 93 Optional trunk...
Page 224: ...Simrad SP90 212 851 164510 Rev E SP92 SP93 Blind cover for sonar trunk...
Page 227: ......
Page 228: ......
Page 229: ......
Page 230: ...E 2005 Simrad AS ISBN 10 82 8066 001 1 ISBN 13 978 82 8066 001 5...
Page 232: ......