Introduction
11
851-164510 / Rev.E
1.7 General installation requirements
Responsibility and approval
The Simrad SP90’s Hull Unit sleeve has been approved by Det
Norske Veritas (DNV) Classification society. Individual Hull
Unit installations must be approved on a case-by-case basis with
regard to the vessel’s national registry and corresponding
maritime authority. The shipowner and shipyard performing the
installation are responsible for obtaining installation approval.
Supply power
The supply voltage to the equipment is to be kept within
±
10%
of the installation’s nominal voltage. Maximum transient
voltage variations on the main switchboard’s bus-bars are not to
exceed -15% to +20% of the nominal voltage (except under
fault conditions).
Simrad recommends that the SP90 sonar is powered using an
Uninterruptible Power Supply (UPS). The UPS should have the
capacity to independently maintain power to the sonar for a
minimum of 10 minutes. This ensures that the system can be
switched off in a controlled manner in the event of a power
failure.
Environmental requirements
All equipment, unless otherwise specified, must be protected
from temperature extremes and excessive humidity.
Compass deviation
Once the installation is complete, the vessel must be swung with
the sonar in both the operative and inoperative modes. The
shipowner and captain are responsible for updating the deviation
table accordingly with regard to the vessel’s national registry
and corresponding maritime authority.
Noise sources
The vessel’s hull, rudder(s) and propeller(s) should be
thoroughly inspected in dry dock prior to installation.
Roughness below the water-line deformities in the shell plating
and protruding obstacles can create underwater noise. These
sources of turbulence must be smoothed or removed as best as
possible. It is especially important that the propeller(s) is not
pitted or damaged.
Summary of Contents for SP90 - REV E
Page 2: ......
Page 12: ...Simrad SP90 VIII 851 164510 Rev E...
Page 62: ...Simrad SP90 50 851 164510 Rev E Figure 10 Mounting the Transceiver Unit CD3110A...
Page 75: ...Cable layout 63 851 164510 Rev E Figure 15 SP90 Cable plan...
Page 214: ...Simrad SP90 202 851 164510 Rev E SP90 Sonar Operating Panel Outline dimensions...
Page 215: ...Drawing file 203 851 164510 Rev E SP90 Sonar Processing Unit MC70 Outline dimensions...
Page 216: ...Simrad SP90 204 851 164510 Rev E SP90 Sonar Interface Unit Outline dimensions...
Page 217: ...Drawing file 205 851 164510 Rev E SP90 Transceiver Unit Outline dimensions...
Page 218: ...Simrad SP90 206 851 164510 Rev E SP90 Standard loudspeaker outline dimensions...
Page 219: ...Drawing file 207 851 164510 Rev E SP92 Hull Unit Outline dimensions...
Page 220: ...Simrad SP90 208 851 164510 Rev E SP93 Hull Unit Outline dimensions...
Page 221: ...Drawing file 209 851 164510 Rev E SP92 SP93 Mounting trunk Page 1 of 2...
Page 222: ...Simrad SP90 210 851 164510 Rev E SP92 SP93 Mounting trunk Page 2 of 2...
Page 223: ...Drawing file 211 851 164510 Rev E SP92 93 Optional trunk...
Page 224: ...Simrad SP90 212 851 164510 Rev E SP92 SP93 Blind cover for sonar trunk...
Page 227: ......
Page 228: ......
Page 229: ......
Page 230: ...E 2005 Simrad AS ISBN 10 82 8066 001 1 ISBN 13 978 82 8066 001 5...
Page 232: ......