background image

BA_EA-KL²-DF(-K)_EN_13 

www.simon-protec.com

 

Date: 20.08.2019 

Issue: 1.3 / 08.2019

 

[email protected]

 

Page 11

Mounting

3.5.  Prepare the actuator

Determine

mounting position

Prepare actuator

direction of rotation

fastening strip

Mount

rail

2

3.5.1.  Adjust the direction of rotation

The actuator EA-KL²-DF(-K) can be used flexibly with regard 

to the installation situation and direction of rotation.    

In “OPEN” direction, the actuator stops  

automatically, 

 starting from its 0-point, after reaching the set  maximum 

stroke. 

 

     

In “CLOSE” direction, the actuator always stops due to 

overload cut-off after reaching the set SOFT-CLOSE 

 

current. 

      

To facilitate installation, you can adjust the direction of rota-

tion even when the unit is not mounted.

Figure 14: direction of rotation

Standard–OPEN

Inverse–OPEN

delivery status

3.5.1.a.  Direction of rotation change via SIMON 

LINK

To parametrise the actuator via the SIMON LINK software, 

proceed as described in section 1.5: “SIMON LINK” on 

page 5.

3.5.1.b.  Direction of rotation change via electrical 

connection

Without using SIMON LINK, change the direction of rotation 

as follows:

 

¾

Connect the “yellow” and “red” wires. 

 

¾

Supply the actuator with power so that it drives in the 

“CLOSE” direction to be set.

 

¾

Let the actuator drive briefly in the new “CLOSE” direc

-

tion. Then stop the actuator.

 

Ô

Starting from the driven “CLOSE” direction, the actua-

tor has now saved its direction of rotation.

 

¾

Disconnect the “yellow” and “red” wires and insolate 

them.

3.5.2.  Transfer fastening strip 

(from 

STANDARD to ALTERNATIVE)

Figure 15: Fastening strip

A

B

C

D

E

F

1

2

3

4

A

B

C

D

E

F

1

2

3

4

SIMON PROtec 

Systems GmbH

Medienstr. 8

D-94036 Passau

Tel. +49 851 98870-0

Fax. +49 851 98870-70

Blatt:

Revision:

Bezeichnung:

Teile-/Artikelnummer:

Zeichnungsnummer:

Allg. Toleranz:

Oberfläche:

DIN ISO 1302

DIN ISO 2768 - m

Projekt:

Material:

gezeichnet:

 

S.Kühling

Betriebsanleitung

EA-KL²-DF(-K)

1 / 1 

27.03.2019

geprüft / geändert:

von:

am:

09.05.2019

S.Kühling

am:
von:

konstruiert:

-

Gewicht:

Maßstab:

1 / 2

Blattgröße:

A4

Typ:

Schutzvermerk

ISO 16016 beachten!

von:

am:

fastening strip STANDARD

fastening strip ALTERNATIVE

Figure 16: Release the cover

SIM

ON

 R

WA

 

Sys

tem

e G

mbH

Med

ien

str.

 8

940

36 

Pas

sau

Tel

. +

49 

851

 98

870

-0

Fax

. +

49 

851

 98

870

-70

Bla

tt:

Rev

isi

on:

Bez

eic

hnu

ng:

Tei

le-

/Ar

tik

eln

um

mer

:

Zei

chn

ung

snu

mm

er:

Allg

. T

ole

ran

z:

Obe

rflä

che

:

DIN

 IS

O 1

302

DIN

 IS

O 2

768

 - m

Pro

jek

t:

Mat

eria

l:

gez

eic

hne

t:

Beg

eis

ter

ung

 tri

fft 

Tec

hni

k

SIM

ON

 R

WA

R

 

M.S

chw

ing

e

EA-

KL²

-D

F

Dre

hflü

gel

ant

rie

b 5

00 

N

KL2

-1.

18-

01-

4b

1 / 

1.0

M2 

149

5

30.

04.

201

4

gep

rüf

t / 

geä

nde

rt:

von

:

am

:

03.

11.

201

4

skü

hlin

g

am

:

von

:

kon

stru

ier

t:

Gew

ich

t:

Maß

sta

b:

Bla

ttg

röß

e:

A3

Figure 17: Transfer fastening strip

SIM

ON

 R

WA

 

Sys

tem

e G

mbH

Med

ien

str.

 8

940

36 

Pas

sau

Tel

. +

49 

851

 98

870

-0

Fax

. +

49 

851

 98

870

-70

Bla

tt:

Rev

isi

on:

Bez

eic

hnu

ng:

Tei

le-

/Ar

tik

eln

um

mer

:

Zei

chn

ung

snu

mm

er:

Allg

. T

ole

ran

z:

Obe

rflä

che

:

DIN

 IS

O 1

302

DIN

 IS

O 2

768

 - m

Pro

jek

t:

Mat

eria

l:

gez

eic

hne

t:

Beg

eis

ter

ung

 tri

fft 

Tec

hni

k

SIM

ON

 R

WA

R

 

M.S

chw

ing

e

EA-

KL²

-D

F

Dre

hflü

gel

ant

rie

b 5

00 

N

KL2

-1.

18-

01-

4b

1 / 

1.0

M2 

149

5

30.

04.

201

4

gep

rüf

t / 

geä

nde

rt:

von

:

am

:

03.

11.

201

4

skü

hlin

g

am

:

von

:

kon

stru

ier

t:

Gew

ich

t:

Maß

sta

b:

Bla

ttg

röß

e:

A3

SIM

ON

 R

WA

 

Sys

tem

e G

mbH

Med

ien

str.

 8

940

36 

Pas

sau

Tel

. +

49 

851

 98

870

-0

Fax

. +

49 

851

 98

870

-70

Bla

tt:

Rev

isi

on:

Bez

eic

hnu

ng:

Tei

le-

/Ar

tik

eln

um

mer

:

Zei

chn

ung

snu

mm

er:

Allg

. T

ole

ran

z:

Obe

rflä

che

:

DIN

 IS

O 1

302

DIN

 IS

O 2

768

 - m

Pro

jek

t:

Mat

eria

l:

gez

eic

hne

t:

Beg

eis

ter

ung

 tri

fft 

Tec

hni

k

SIM

ON

 R

WA

R

 

M.S

chw

ing

e

EA-

KL²

-D

F

Dre

hflü

gel

ant

rie

b 5

00 

N

KL2

-1.

18-

01-

4b

1 / 

1.0

M2 

149

5

30.

04.

201

4

gep

rüf

t / 

geä

nde

rt:

von

:

am

:

03.

11.

201

4

skü

hlin

g

am

:

von

:

kon

stru

ier

t:

Gew

ich

t:

Maß

sta

b:

Bla

ttg

röß

e:

A3

Figure 18: Screw cover

SIM

ON

 R

WA

 

Sys

tem

e G

mbH

Med

ien

str.

 8

940

36 

Pas

sau

Tel

. +

49 

851

 98

870

-0

Fax

. +

49 

851

 98

870

-70

Bla

tt:

Rev

isi

on:

Bez

eic

hnu

ng:

Tei

le-

/Ar

tik

eln

um

mer

:

Zei

chn

ung

snu

mm

er:

Allg

. T

ole

ran

z:

Obe

rflä

che

:

DIN

 IS

O 1

302

DIN

 IS

O 2

768

 - m

Pro

jek

t:

Mat

eria

l:

gez

eic

hne

t:

Beg

eis

ter

ung

 tri

fft 

Tec

hni

k

SIM

ON

 R

WA

R

 

M.S

chw

ing

e

EA-

KL²

-D

F

Dre

hflü

gel

ant

rie

b 5

00 

N

KL2

-1.

18-

01-

4b

1 / 

1.0

M2 

149

5

30.

04.

201

4

gep

rüf

t / 

geä

nde

rt:

von

:

am

:

03.

11.

201

4

skü

hlin

g

am

:

von

:

kon

stru

ier

t:

Gew

ich

t:

Maß

sta

b:

Bla

ttg

röß

e:

A3

Summary of Contents for EA-KL2-DF

Page 1: ...0 Fax 49 851 98870 70 Blatt Revision Bezeichnung Teile Artikelnummer Zeichnungsnummer Allg Toleranz Oberfl che DIN ISO 1302 DIN ISO 2768 m Projekt Material gezeichnet S K hling EA KL DF Fenster f r BA...

Page 2: ...3 Second sash installation 9 3 4 Determine mounting position 10 3 5 Prepare the actuator 11 3 5 1 Adjust the direction of rotation 11 3 5 1 a Direction of rotation change via SIMON LINK 11 3 5 1 b Dir...

Page 3: ...ches to be pressed activated are shown in bold Indicators are put in quotation marks 1 2 Use for the intended purpose Opening actuators are used for power operated opening and closing of building cove...

Page 4: ...e 1 Folding Arm rotary wing EA KL DF B C D E F 1 2 3 4 B C D E F SIMON PROtec Systems GmbH Medienstr 8 D 94036 Passau Tel 49 851 98870 0 Fax 49 851 98870 70 Blatt Revision Bezeichnung Teile Artikelnum...

Page 5: ...in OPEN and or CLOSE the dry contact can be set a detailed status message of the actuator can be read out To connect the actuator with SIMON LINK it must be sup plied with 24 V DC continuously and sw...

Page 6: ...TOP Fastening strip STANDARD DIN RIGHT OUTSIDE opening Actuator ON TOP Fastening strip ALTERNATIVE DIN LEFT OUTSIDE opening Actuator BOTTOM Fastening strip ALTERNATIVE Figure 6 Direction of rotation...

Page 7: ...ey brown black yellow red Tandem Port electr insulate Dry contact CLOSE max 28 V 2 0 A OPEN S O CLOSE Pole change factory provided actuator S GND O T NO1 NO2 2 3 TANDEM operation ATTENTION Only for ac...

Page 8: ...Figure 7 Installation sequence SINGLE installation Determine mounting position Prepare actuator direction of rotation fastening strip Mount rail Install mounting plate and actuator Mount slide Perfor...

Page 9: ...dert von am 04 04 2019 S K hling am von konstruiert Gewicht Ma stab 1 8 Blattgr e A3 Typ Standard Fenster Schutzvermerk ISO 16016 beachten von am Side wing inward second sash Startup Open delay Main w...

Page 10: ...arameters and must be defined before installation of the actuator in case of doubt External influencing factors such as wind loads and sash weight may play a significant role in this case Figure 10 EA...

Page 11: ...von am 09 05 2019 S K hling am von konstruiert G Typ Schutzvermerk ISO 16016 beachten von am fastening strip STANDARD fastening strip ALTERNATIVE Figure 16 Release the cover SIMON RWA Systeme GmbH Med...

Page 12: ...ail Install mounting plate and actuator Mount slide 4 Figure 21 mounting plate opening inward SIMON RWA Systeme GmbH Medienstr 8 94036 Passau Tel 49 851 98870 0 Fax 49 851 98870 70 Blatt Revision Beze...

Page 13: ...von am 4 Nm 3 9 Perform a RESET run Mount slide Perform RESET run test run Mount cover 6 3 9 1 SINGLE operation After mounting and connecting the actuator to the slide make sure that the window is sl...

Page 14: ...ximum cut off current in OPEN CLOSE direction 1 2 A 1 6 A 2 Current consumption after cut off closed current 65 mA Cut off via built in electronic overload cut off Maximum permissible number of actuat...

Page 15: ...rgency power batteries Table 4 Mechanical properties Actuator type EA KL DF K EA KL DF Maximum pushing force 9 400 N 500 N Maximum pull force 9 400 N 500 N Condition of loading Open against nominal lo...

Page 16: ...379368 0 Fax 49 0 851 379368 70 SIMON PROtec Deutschland GmbH Fraunhoferstra e 14 82152 Planegg Martinsried Tel 49 0 89 7917011 Fax 49 0 89 7917972 E Mail info simon protec de Internet www simon prot...

Reviews: