3.2.8. S1 Facilities Connector
TOOLS, TEST EQUIPMENT AND MATERIALS REQUIRED
4.1. INSTALLATION OF THE WALL MOUNT UNIT
5 RACK MOUNT INSTALLATION PROCEDURE
5.1. TOOLS, TEST EQUIPMENT AND MATERIALS REQUIRED
5.3. FITTING THE SDB680 BASE STATION
6 CONFIGURATION OF NEW TIER II BASE STATION
TOOLS, TEST EQUIPMENT AND MATERIALS REQUIRED
6.2. SDMT INSTALLATION AND PREPARATION
6.3. INSTALLING THE SIMOCO IP CONFIGURATION SERVER
7 CONFIGURATION OF NEW TIER III BASE STATION
TOOLS, TEST EQUIPMENT AND MATERIALS REQUIRED
7.3. SDMT INSTALLATION AND PREPARATION
7.4. INSTALLING THE SIMOCO IP CONFIGURATION SERVER
7.5. 4.5 IP ADDRESS CONFIGURATION
7.6.1. Platform and Application Software Update
7.6.2. Software Licence Update
7.6.3. Configuration Creation and Upload
8 BASE CONFIGURATION TIER II TO TIER III
TOOLS, TEST EQUIPMENT AND MATERIALS REQUIRED
8.1. TIER III BASE PREREQUISITES
Doc Number:
TNM-I-E-0046 ISSUE 1.2
Page
7