6 CONFIGURATION OF NEW TIER II BASE
STATION
This Procedure should be followed when configuring all new Tier II
SDB680 Base Stations after their initial installation in a new system.
TOOLS, TEST EQUIPMENT AND MATERIALS REQUIRED
The following Tools, Test Equipment and Materials will be required to perform this
procedure:
Dummy Load
Personal Computer
Software Applications:
Simoco Digital Management Terminal (SDMT)
Simoco IP Configuration Tool
Notes
(i). The software applications listed above are available for download on the Simoco
website http://www.simocowirelesssolutions.com via the Partner Portal. To access
the Partner Portal a Username and Password will be required.
(ii). To request access to the partner portal please contact your local business
development manager or alternatively contact the relevant Simoco Customer
Services (see Support Page for details).
6.1. SDB680 PREPARATION
WARNING
RF RADIATION. A RF RADIATION HAZARD EXISTS IN THIS EQUIPMENT.
TO AVOID RF INJURY, DO NOT TOUCH THE ANTENNA WHEN THE
TRANSMITTER IS IN USE. DO NOT OPERATE TRANSMITTER WITH
ANTENNA DISCONNECTED. REFER TO EU DIRECTIVE 2004/40/EC DATED
29 APRIL 2004.
1. Ensure that the SDB680 base stations are securely fitted into the rack and that
the power and antenna cables are connected on the rear panel.
2. On the SDB680 rear panel, connect the Tx antenna socket to a suitable dummy
load (for the 50W base a minimum 60 Watt load can be used provided that it is
suitable for use).
Doc Number:
TNM-I-E-0046 ISSUE 1.2
Page
39