72
1.2.5
ASSEMBLY OF THE
ACCESSORIES
The closing handles for the ports and the
screw with the adjustment knob for the
blast gate damper are supplied separately,
since they could be damaged during the
transport.
Both the handles and the screws with knob
are packed in a nylon bag, introduced insi-
de the ash collection basin.
For the assembly of the handles proceed as
following (fig. 4):
– Take a handle (1), insert it in the opening
of the load port (2) and introduce the roll
(3) in the opening of the handle; block the
handle introducing the elastic split pin
(4).
– Carry out the same operation for the han-
dle of the ash box port.
To assemble the screw with the knob, pro-
ceed as follows (fig. 5):
– Remove the screw M8 x 60, which fixes
the air blast damper to the ash box port
and screw the screw with the bakelite
knob (1) on, which is supplied in the
packaging.
Place the blind nut with cap (2) at the end
of screw M 10.
– Fix lever M6 to the air blast damper (3)
placing it in a horizontal direction on the
right. The lever has an opening at its end,
where the chainlet of the thermostatic
regulator will be connected.
1.2.6
CASING ASSEMBLY
Two superior tie rods are screwed on three
nuts at the front side of the boiler: the
second and the third nut serve to place cor-
rectly the lateral sides of the casing.
Two nuts one to fix the clamp holders for
the lateral sides are screwed on the inferior
tie rods, both from the front side and from
the rear side of the boiler. The assembly of
the casing components has to be carried
out in the following way (fig. 6):
– Unscrew with some rotations the second
or third nut of each tie rod.
– Hook the left side (1) on the lower tie rod
and superior of the boiler and adjust the
position of the nut and locknut of the up-
per tie rod.
– Fix the lateral side in blocking the lock-
nut.
– In order to assembly the right side (2)
proceed in the same way.
– Hook the front upper board (3) introdu-
cing the two splines in the opening, ob-
tained on each side.
– Carry out the same operation to fix the
back lower board (4).
– The protection deflector (5) is fixed to
the control board (6) with three self-
threading screws.
Fix the board by means of the pressure
stakes.
Then unwind the capillary of the thermo-
meter and introduce it in the left sheath
of the posterior head, introducing the
contact spring.
The right sheath can be needed for the
check thermometer.
– Fix the cover (7) at the lateral sides of the
boiler.
NOTE: Keep the “Test certification” together
with the boiler documents in the combu-
stion chamber.
1.2.7
DRAUGHT REGULATOR
The boilers “SOLIDA 8 PL” can assemble indif-
ferently 2 types of thermostatic regulators.
NOTE: In order to fix the lever with the
chainlet in the regulator holder it is neces-
sary to remove the deflector in aluminum,
which is assembled on the control board, by
unscrewing the three screws that fix it (fig. 6).
Replace the protection deflector after the
assembling and related adjustment.
“THERMOMAT RT-C” Regulator
The “Thermomat” regulator is equipped
with a thermosetting resin knob of an
adjustment field from 30 to 100 °C (fig. 7).
Screw the regulator on the 3/4” opening
of the anterior head and orientate the red
index on the upper part.
The lever with the chainlet should be intro-
duced in the regulator holder after having
assembled the instrument holder board
and after having removed the plastic lock.
If the joint is taken out, which fixes the lever
with the chainlet, take care in assembling
LEGEND
1 Handle
2 Load port
3 Roll
4 Elastic split pin
Fig. 4
LEGEND
1 Screw with knob M10 x 70
2 Blind nut with cap
3 Blast gate damper
Fig. 5
LEGEND
1 Left side
2 Right side
3 Posterior superior board
4 Posterior inferior board
5 Protection deflector
6 Control board
7 Cover
Fig. 6