79
IT
ES
GB
PT
Tiranti sol
o
per c
ontenitor
e
da 500 dm
3
5 x
2 x
4 x
4 x
2 x
4 x
2 x
4 x (200-300 dm
3
)
6 x (500 dm
3
)
8 x (200-300 dm
3
)
10 x (500 dm
3
)
4 x (200-300 dm
3
)
6 x (500 dm
3
)
5 x
8 x (200-300 dm
3
)
10 x (500 dm
3
)
6 x
TCB M5x12 (66 x)
TCB M6x8 (2 x)
TCB 7SPx3/8” (4 x)
TSP M5x20 (8 x)
Mod. 500 d
m
3
TCB M5x12 (54 x)
TCB M6x8 (2 x)
TCB 7SPx3/8” (4 x)
TSP M5x20 (8 x)
Mod. 200-300 d
m
3
4 x
2 x
4 x
4 x
M) Assemble the pellet container (with a capacity of 200 - 500 dm
3
) on the right of the boiler, in support to the boiler and align its front section.
Fig. 13.20: Assembly of the elements of the pellet container
Tie rods Only for 500 dm
3
containers